  • The type of pointing in which a V-shaped projection outside the wall surface, is provided, is called


  • Options
  • A. recessed pointing
  • B. weather pointing
  • C. V-pointing
  • D. tuck pointing.

  • Correct Answer
  • weather pointing 


  • Building Construction problems


    Search Results


    • 1. The ceiling height of a building is

    • Options
    • A. between ceiling and ground level
    • B. between ceiling and floor level
    • C. upto roof above ground level
    • D. upto ceiling from the ground level.
    • Discuss
    • 2. The sill of a common wooden partition is

    • Options
    • A. vertical wooden member on either end
    • B. lower horizontal wooden member
    • C. upper horizontal wooden member
    • D. intermediate horizontal wooden member.
    • Discuss
    • 3. Pick up the correct statement from the following :

    • Options
    • A. sand consists of coarse particles of silica formed due to the disintegration of rocks.
    • B. the grains of sand are not affected by frost
    • C. sand beds are permeable and do not allow water to rise up between pores due to capillary action
    • D. all the above.
    • Discuss
    • 4. Pick up the correct statement from the following :

    • Options
    • A. The bearing capacity of a pile is defined as the load which can be sustained by the pile without producing excessive settlement
    • B. The ultimate bearing capacity of a pile is defined as the maximum load which the pile carries and continues to sink without any further increases of load
    • C. The safe bearing capacity of a pile is obtained by dividing the ultimate bearing capacity with a suitable factor of safety
    • D. The factor of safety for piles is taken as 6
    • E. All the above.
    • Discuss
    • 5. The window which is provided in flat roof of a room, is known

    • Options
    • A. dormer window
    • B. lantern window
    • C. louvered window
    • D. sky window.
    • Discuss
    • 6. For a rectangular foundation of width b, eccentricity of load should not exceed

    • Options
    • A. b/2
    • B. b/3
    • C. b/4
    • D. b/5
    • E. b/6.
    • Discuss
    • 7. Pick up the correct statement from the following:

    • Options
    • A. Bulking of sand is caused due to formation of a thin film of surface moisture
    • B. Fine sand bulks more than coarse sand
    • C. With 10% moisture content by weight, the bulking of sand is increased by 50%.
    • D. The volume of fully saturated sand, is equal to the volume of dry and loose sand
    • E. All the above.
    • Discuss
    • 8. Pick up the correct statement from the following:

    • Options
    • A. The free water is the amount of water added while mixing and the amount of water held on the surface of the aggregates prior to mixing
    • B. The total water is the free water and the amount actually absorbed by the aggregates
    • C. Neither (a) nor (b)
    • D. Both (a) and (b).
    • Discuss
    • 9. For compacting plain concrete road surface of thickness less than 20 cm, we use

    • Options
    • A. internal vibrator
    • B. screed vibrator
    • C. form vibrator
    • D. none of these.
    • Discuss
    • 10. Specified compressive strengh of concrete is obtained from cube tests at the end of

    • Options
    • A. 3 days
    • B. 7 days
    • C. 14 days
    • D. 21 days
    • E. 28 days.
    • Discuss