CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Building Construction
Comments
Question
Which one of the following activities is not correct as applicable to brick corbels
Options
A. the maximum projection of the corbel should not be more than the thickness of the wall
B. the maximum projection of each corbel course should be limited to a quarter brick at a time
C. the discontinuous corbels are used to carry heavy concentrated loads
D. stretcher bond is generally used for the construction of brick corbel.
Correct Answer
stretcher bond is generally used for the construction of brick corbel.
Building Construction problems
Search Results
1. The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is
Options
A. 10 cm
B. 15 cm
C. 20 cm
D. 25 cm
E. 30 cm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 20 cm
2. The pile which supports the load due to friction between pile face and surrounding soil, is generally known as
Options
A. bearing pile
B. friction pile
C. sheet pile
D. battered pile.
Show Answer
Scratch Pad
Discuss
Correct Answer: friction pile
3. The voussoir placed at crown of an arch, is known as a
Options
A. key
B. soffit
C. springer
D. haunch.
Show Answer
Scratch Pad
Discuss
Correct Answer: key
4. The local swelling of a finished plaster, is termed
Options
A. cracking
B. dubbing
C. blistering
D. hacking.
Show Answer
Scratch Pad
Discuss
Correct Answer: blistering
5. Pick up the correct statement from the following :
Options
A. D.P.C. should be continuous
B. D.P.C. should be of good impervious material
C. D.P.C. may be horizontal or vertical
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
6. For each storey of a building, the depth of exploration should be
Options
A. 1 metre
B. 2 metres
C. 3 metres
D. 4 metres.
Show Answer
Scratch Pad
Discuss
Correct Answer: 3 metres
7. Pick up the correct statements from the following :
Options
A. cracks appear on the plastered surface in the form of hair cracks
B. in brick work, the efflorescence is removed by applying a solution of zinc sulphate and water
C. excessive thermal variations in the backing or plaster causes the plaster to fall
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. The minimum width of a stair in residential buildings, is
Options
A. 55 cm
B. 70 cm
C. 85 cm
D. 100 cm
E. 120 cm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 85 cm
9. The Auger boring method is not suitable for
Options
A. very hard soil
B. cemented soil
C. vary soft soil
D. fully saturated cohesionless soils
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
10. A pre-stressed concrete pile is
Options
A. easy to handle
B. lighter in weight
C. extremely durable
D. suitable for heavy load
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering