CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Building Construction
Comments
Question
Crown is located at
Options
A. highest point on the extrados of the arch
B. highest point on the intrados of the arch
C. skew-back of the arch
D. none of these.
Correct Answer
highest point on the extrados of the arch
Building Construction problems
Search Results
1. Pick up the incorrect statement from the following :
Options
A. In Flemish bond, headers and stretchers are laid alternately in the same course
B. In Flemish bond every header in each course lies centrally over every stretcher of the underlying course
C. In English bond, stretchers are laid in every course
D. In English bond, headers and stretchers are laid in alternate courses
E. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: In English bond, stretchers are laid in every course
2. Pick up the incorrect statement from the following :
Options
A. Horizontal D.P.C. is provided at plinth level in internal walls
B. D.P.C. is provided under door and verandah openings
C. Vertical D.P.C. is not provided in internal walls
D. Cement concrete is a rigid damp-proofing material.
Show Answer
Scratch Pad
Discuss
Correct Answer: D.P.C. is provided under door and verandah openings
3. The pile which supports the load partly by friction and partly by resting on hard stratum, is called
Options
A. friction pile
B. bearing pile
C. friction bearing pile
D. rough pile.
Show Answer
Scratch Pad
Discuss
Correct Answer: friction bearing pile
4. Pick up the correct statement from the following :
Options
A. lime mortar with cement in the ratio of in 10 is cheaper and better for outside plaster
B. the lime with surkhi used as mortor for construction reduces the cost and provides equal strength to wall
C. for very cold or very hot climate, a compact and closed plan should be provided
D. on the sea coast, an exposed and open house is generally preferred
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
5. The construction joints in buildings are provided after
Options
A. 10 m
B. 15 m
C. 20 m
D. 40 m
E. 60 m.
Show Answer
Scratch Pad
Discuss
Correct Answer: 40 m
6. In soils possessing low bearing capacity, the type of foundation generally provided, is
Options
A. column footing
B. grillage footing
C. raft footing
D. mat footing
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
7. Stability of an existing structure may be disturbed by
Options
A. rising of water table
B. vibrations caused by traffic movements
C. mining in the neighbourhood
D. excavation in the neighbourhood
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. Pick up the correct statement from the following :
Options
A. the first coat of stucco plaster is called scratch coat
B. the second coat of stucco plaster is called brown coat
C. the third coat of stucco plaster is called white coat
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
9. A floor constructed with the 4 to 6 mm marble chips, is known
Options
A. reinforced marble floor
B. terrazo floor
C. marble floor
D. chip floor
E. mosaic floor.
Show Answer
Scratch Pad
Discuss
Correct Answer: terrazo floor
10. Pick up the correct statement from the following :
Options
A. the roof slabs of multi-storeyed buildings are constructed monolithically to carry the various floor loads
B. the beams of multi-storeyed buildings rest on girders and are the main load transferring members to the columns
C. the slab is spanned across the secondary beams provided between the main beams
D. All of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: All of these.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering