  • Question
  • In soft clay of low bearing capacity, the type of steel pile generally used, is


  • Options
  • A. H-pile
  • B. screw pile
  • C. disc pile
  • D. pipe pile
  • E. raking pile.

  • Correct Answer
  • screw pile 


  • Building Construction problems


    Search Results


    • 1. The form work from the slabs excluding props, can be removed only after

    • Options
    • A. 1 day
    • B. 4 days
    • C. 7 days
    • D. 14 days
    • Discuss
    • 2. Which of the following metal sheets is most effective in preventing dampness?

    • Options
    • A. Copper sheets
    • B. lead sheets
    • C. aluminium sheets
    • D. all the above.
    • Discuss
    • 3. An arch may fail due to

    • Options
    • A. uneven settlement of abutments
    • B. sliding of voussoirs
    • C. crushing of the material
    • D. all the above.
    • Discuss
    • 4. For plastering the exposed brick walls, the cement sand mortar should be

    • Options
    • A. 1:2
    • B. 1:3
    • C. 1:4
    • D. 1:6
    • E. 1:8.
    • Discuss
    • 5. The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is

    • Options
    • A. truck pointing
    • B. recessed pointing
    • C. struck pointing
    • D. grooved pointing.
    • Discuss
    • 6. The sound which continues even after its source is cut off, is called

    • Options
    • A. reverberation
    • B. echo
    • C. intensity of sound
    • D. interference.
    • Discuss
    • 7. The pile provided with one or more bulles in its vertical shaft, is generally known as

    • Options
    • A. under-ream pile
    • B. friction pile
    • C. bearing pile
    • D. sheet pile.
    • Discuss
    • 8. The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is

    • Options
    • A. H-pile
    • B. pipe pile
    • C. screw pile
    • D. disc pile
    • E. none of these.
    • Discuss
    • 9. The form work from the sides of beams can be removed only after

    • Options
    • A. 1 day
    • B. 4 days
    • C. 7 days
    • D. 14 days.
    • Discuss
    • 10. The concrete slump recommended for foundations, is

    • Options
    • A. 25 to 50 mm
    • B. 30 to 125 mm
    • C. 50 to 100 mm
    • D. 75 to 125 mm
    • E. none of these.
    • Discuss