CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Building Construction
Comments
Question
The depth of an arch is the distance between
Options
A. ground level and springing line
B. crown and springing line
C. crown and ground level
D. intrados and extrados.
Correct Answer
intrados and extrados.
Building Construction problems
Search Results
1. Raft foundation are generally preferred to when the area required for individual footing, is more than
Options
A. 25% to total area
B. 30% of total area
C. 40% to total area
D. 50% of total area.
Show Answer
Scratch Pad
Discuss
Correct Answer: 50% of total area.
2. For heavy embankments and dams, of height
h
, the depth of exploration of soil should not be less than
Options
A.
h
/4
B. 1/2
h
C.
h
D. 2
h
.
Show Answer
Scratch Pad
Discuss
Correct Answer: 2
h
.
3. The angle between skew back of a flat arch and the horizontal, is kept approximately equal to
Options
A. 0°
B. 30°
C. 60°
D. 90°
E. 120°.
Show Answer
Scratch Pad
Discuss
Correct Answer: 60°
4. A floor constructed with 3 mm marble chips, is known
Options
A. mosaic floor
B. terrazo floor
C. chips floor
D. marble floor.
Show Answer
Scratch Pad
Discuss
Correct Answer: terrazo floor
5. For brick construction, the lime-sand mortar, is
Options
A. 1:1
B. 1:2
C. 1:3
D. 1:4
E. 1:5.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1:2
6. The platform at the end of a series of steps, is known as
Options
A. platform
B. relief
C. rest
D. landing
E. stop.
Show Answer
Scratch Pad
Discuss
Correct Answer: landing
7. The skirting/dado in a bath roof should be upto
Options
A. ceiling
B. 15 cm above floor level
C. 200 cm
D. level of the tap.
Show Answer
Scratch Pad
Discuss
Correct Answer: 200 cm
8. For a wall carrying heavy load on low bearing capacity soil,
Options
A. lean concrete bed is provided
B. thick concrete bed is provided
C. reinforced concrete bed is provided
D. (a) and (c) of the above
E. (b) and (c) of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: (a) and (c) of the above
9. In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used
Options
A. vibro pile
B. pressure pile
C. Franki pile
D. pedestal pile.
Show Answer
Scratch Pad
Discuss
Correct Answer: vibro pile
10. The compaction of concrete in the drilled pile hole is done by compressed air in the case of
Options
A. simplex pile
B. Franki pile
C. pressure pile
D. vibro pile.
Show Answer
Scratch Pad
Discuss
Correct Answer: pressure pile
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering