  • A floor constructed with 3 mm marble chips, is known


  • Options
  • A. mosaic floor
  • B. terrazo floor
  • C. chips floor
  • D. marble floor.

  • Correct Answer
  • terrazo floor 


  • Building Construction problems


    Search Results


    • 1. For brick construction, the lime-sand mortar, is

    • Options
    • A. 1:1
    • B. 1:2
    • C. 1:3
    • D. 1:4
    • E. 1:5.
    • Discuss
    • 2. The columns of multi-storeyed buildings are designed to withstand the forces due to

    • Options
    • A. dead loads
    • B. live loads
    • C. wind loads
    • D. earthquakes
    • E. all of these.
    • Discuss
    • 3. The inclined surface of an abutment to receive the arch, is known as

    • Options
    • A. skew back
    • B. soffit
    • C. spandril
    • D. haunch.
    • Discuss
    • 4. In clay soil

    • Options
    • A. swelling and shrinkage characteristics prevail
    • B. consolidation continues even after several years of construction.
    • C. differential settlement is generally prevalent
    • D. all the above.
    • Discuss
    • 5. The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to

    • Options
    • A. 10 mm
    • B. 20 mm
    • C. 30 mm
    • D. 40 mm
    • E. 50 mm.
    • Discuss
    • 6. The angle between skew back of a flat arch and the horizontal, is kept approximately equal to

    • Options
    • A. 0°
    • B. 30°
    • C. 60°
    • D. 90°
    • E. 120°.
    • Discuss
    • 7. For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than

    • Options
    • A. h/4
    • B. 1/2 h
    • C. h
    • D. 2 h.
    • Discuss
    • 8. Raft foundation are generally preferred to when the area required for individual footing, is more than

    • Options
    • A. 25% to total area
    • B. 30% of total area
    • C. 40% to total area
    • D. 50% of total area.
    • Discuss
    • 9. The depth of an arch is the distance between

    • Options
    • A. ground level and springing line
    • B. crown and springing line
    • C. crown and ground level
    • D. intrados and extrados.
    • Discuss
    • 10. The platform at the end of a series of steps, is known as

    • Options
    • A. platform
    • B. relief
    • C. rest
    • D. landing
    • E. stop.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment