  • Question
  • The process of keeping concrete moist for a certain period after its finishing, is known as


  • Options
  • A. finishing of concrete
  • B. curing of concrete
  • C. placing of concrete
  • D. compaction of concrete
  • E. none of these.

  • Correct Answer
  • curing of concrete 


  • Building Construction problems


    Search Results


    • 1. Pick up the incorrect statement from the following:

    • Options
    • A. The retaining wall should be structurally capable to resist the applied earth pressure
    • B. The section of the retaining wall should be so proportioned that it may not overturn by the lateral pressure
    • C. The retaining wall should be safe against sliding
    • D. The foundation of the retaining wall should not be stressed beyond safe bearing capacity ; due to its weight and the force resulting from the earth pressure
    • E. to drain off water from the earth retained, weep holes are provided near the top of the retaining wall.
    • Discuss
    • 2. Rotary drilling

    • Options
    • A. is not suitable for deposits containing very coarse gravel
    • B. hinders the ground water observations and permeability test
    • C. is not economical for holes of less than 10 cm.
    • D. all the above.
    • Discuss
    • 3. The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as

    • Options
    • A. combined footing
    • B. strap footing
    • C. raft footing
    • D. none of these.
    • Discuss
    • 4. The opening provided in sloping roof with its top parallel to the roof surface, is called

    • Options
    • A. dormer window
    • B. sky light window
    • C. lantern window
    • D. louvered window.
    • Discuss
    • 5. Exposed portions of vertical surface at right angles to the door or window frame, are known as

    • Options
    • A. jambs
    • B. lintels
    • C. reveals
    • D. soffits.
    • Discuss
    • 6. Dutch bond is a modification of

    • Options
    • A. English bond
    • B. stretcher bond
    • C. header bond
    • D. single Flemish bond.
    • Discuss
    • 7. Bearing capacity of soils cannot be improved by

    • Options
    • A. draining sub-soil water
    • B. ramming crushed stone in soil
    • C. driving sand piles
    • D. watering surface of soil
    • E. none of these.
    • Discuss
    • 8. The dimensions of a half queen closer, are

    • Options
    • A. 9 cm x 9 cm x 9 cm
    • B. 9 cm x 9 cm x 4.5 cm
    • C. 9 cm x 4.5 cm x 9 cm
    • D. 1.8 cm x 4.5 cm x 9 cm.
    • Discuss
    • 9. In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to

    • Options
    • A. 15 mm
    • B. 25 mm
    • C. 35 mm
    • D. 45 mm
    • E. 55 mm.
    • Discuss
    • 10. The lower half portion between crown and skew back of the arch, is called

    • Options
    • A. spandril
    • B. haunch
    • C. springing
    • D. soffit.
    • Discuss