CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Estimating and Costing
Comments
Question
The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
Options
A. 1.00 cum
B. 2.00 cum
C. 3.00 cum
D. 4.00 cum
Correct Answer
3.00 cum
Estimating and Costing problems
Search Results
1. Pick up the incorrect statement from the following:
Options
A. Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil
B. The lead is calculated for each block of the excavated area
C. The unit of lead is 50 m for a distance upto 500 m
D. The unit of lead is 1 km where the lead exceeds 2 km.
Show Answer
Scratch Pad
Discuss
Correct Answer: The unit of lead is 1 km where the lead exceeds 2 km.
2. The value of '
B
' of Indian type W.C. shown in the given figure is :
Options
A. 45 cm
B. 50 cm
C. 30 cm
D. 25 cm
Show Answer
Scratch Pad
Discuss
Correct Answer: 45 cm
3. The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
Options
A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500
Show Answer
Scratch Pad
Discuss
Correct Answer: Rs. 450
4. Pick up the correct statement from the following:
Options
A. In order to check up the average depth of excavation, 'Dead mans' are left at the mid-widths of borrow pits
B. The earthwork calculation in excavation is made from the difference in levels obtained with a level
C. The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
5. The slope of the oultet of '
P
trap' below the horizontal is kept
Options
A. 8°
B. 10°
C. 12°
D. 14°
Show Answer
Scratch Pad
Discuss
Correct Answer: 14°
6. The unit of measurement is per quintal for the following:
Options
A. Collapsible gates with rails
B. Rolling shutters
C. Expanded metal wire netting
D. M.S. reinforcement of R.C.C. works.
Show Answer
Scratch Pad
Discuss
Correct Answer: M.S. reinforcement of R.C.C. works.
7. For the construction of buildings, the subheads of the estimate are
Options
A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. Plastering or pointing, finishing, water supply and sanitary work
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
8. The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
9. The weight of an item is measured correct to nearest
Options
A. 0.25 kg
B. 0.50 kg
C. 0.75 kg
D. 1.00 kg
E. 5 kg
Show Answer
Scratch Pad
Discuss
Correct Answer: 1.00 kg
10. The variation of atmospheric potential is caused due to :
Options
A. difference in temperature over the surface of the earth
B. change in the density of air
C. both (a) and (b)
D. neither (a) nor (b).
Show Answer
Scratch Pad
Discuss
Correct Answer: both (a) and (b)
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering