The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
Options
A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500
Correct Answer
Rs. 450