The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
Options
A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500
Correct Answer
Rs. 450
Estimating and Costing problems
Search Results
1. Pick up the correct statement from the following:
Options
A. In order to check up the average depth of excavation, 'Dead mans' are left at the mid-widths of borrow pits
B. The earthwork calculation in excavation is made from the difference in levels obtained with a level
C. The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers