logo

CuriousTab

CuriousTab

Discussion


Home Civil Engineering Estimating and Costing Comments

  • Question
  • Pick up the correct statement from the following:


  • Options
  • A. Bricks are paid per thousand
  • B. Cement is paid per 50 kg bag
  • C. Lime is paid per quintal
  • D. Brick aggregates is paid per cum
  • E. All the above.

  • Correct Answer
  • All the above. 


  • Estimating and Costing problems


    Search Results


    • 1. The trap which is provided to disconnect the house drain from the street sewer is called

    • Options
    • A. Master trap
    • B. Intercepting trap
    • C. Interception manhole
    • D. Intercepterchamber
    • E. All the above.
    • Discuss
    • 2. Pick up the correct statement from the following:

    • Options
    • A. The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies
    • B. Additional supervising staff engaged at work site, is called work charged establishment
    • C. Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item
    • D. The cost per unit at which the article can be procured, from the open market at a given time, is called 'market rate'
    • E. All the above.
    • Discuss
    • 3. Pick up the correct statement from the following:

    • Options
    • A. All pipes and fittings are classified according to their diameters
    • B. The diameter of the pipes is the nominal diameter of internal bore
    • C. All pipes are measured along the centre line of the pipes in metres
    • D. Lead caulked joints are enumerated separately
    • E. All the above.
    • Discuss
    • 4. The rate of payment is made for 100 cu m (per % cu m) in case of

    • Options
    • A. Earth work in excavation
    • B. Rock cutting
    • C. Excavation in trenches for foundation
    • D. Earth work in filling the plinth
    • E. all the above.
    • Discuss
    • 5. If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

    • Options
    • A. B + d + Sd
    • B. Bd + Sd2
    • C. B x d - Sd1/2
    • D. (Bd + Sd2)
    • Discuss
    • 6. The expected out turn of half brick partition wall per mason per day is

    • Options
    • A. 1.5 m3
    • B. 2.0 m3
    • C. 4.0 m2
    • D. 5.0 m2
    • Discuss
    • 7. The value of 'A' of Indian type W.C. shown in the given figure is :

    • Options
    • A. 25 cm
    • B. 30 cm
    • C. 40 cm
    • D. 45 cm
    • Discuss
    • 8. Carpet area does not include the area of

    • Options
    • A. the walls along with doors and other openings
    • B. verandah, corridor and passage
    • C. bath room and lavatory
    • D. kitchen and pantry
    • E. All the above.
    • Discuss
    • 9. The brick work is not measured in cu m in case of

    • Options
    • A. One or more than one brick wall
    • B. Brick work in arches
    • C. Reinforced brick work
    • D. Half brick wall.
    • Discuss
    • 10. The floor area includes the area of the balcony up to

    • Options
    • A. 100%
    • B. 75%
    • C. 50%
    • D. 25%
    • Discuss


    Comments

    There are no comments.

Enter a new Comment