The rate of payment is made for 100 cu m (per % cu m) in case of
Options
A. Earth work in excavation
B. Rock cutting
C. Excavation in trenches for foundation
D. Earth work in filling the plinth
E. all the above.
Correct Answer
all the above.
Estimating and Costing problems
Search Results
1. If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is