While estimating the qualities for the construction of a building, the correct metric unit is
Options
A. Metre for length
B. Cubic metre for area
C. Square metres for volume
D. Kilogram for weight
E. Litre for capacity
Correct Answer
Litre for capacity
Estimating and Costing problems
Search Results
1. Pick up the correct statement from the following:
Options
A. If the bed level is above N.S.L. the canal is called fully in baking and the berms are designed as 3 d where d is full supply depth of water (F.S.D.)
B. Area of canal in cutting = BD + Sd2 where B = bed width, d = depth of cutting and S is the side slope
C. Area of the bank of canal = B1d1 + Sd2 where B1, d1 and S are the width of bank, height of the bank above N.S.L. and side slope respectively
D. If F.S.L. is above N.S.L the canal is called partly in cutting and partly in filling and berms are designed as 2d where d is full supply depth