CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Construction Management
Comments
Question
Power stations are generally treated as
Options
A. light construction
B. heavy construction
C. industrial construction
D. electrical construction.
Correct Answer
industrial construction
Construction Management problems
Search Results
1. While scheduling a project by C.P.M.
Options
A. a project is divided into various activities
B. required time for each activity is established
C. sequence of various activities is made according to their importance
D. net work is drawn by connecting the activities and the events
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
2. If
t
is the duration of an activity,
t
1
is the latest finish possible moment of its preceding activity and
t
2
is the earliest start possible moment, the independent float of the activity is
Options
A. (
t
1
-
t
2
) -
t
B.
t
- (
t
1
-
t
2
)
C. (
t
1
+
t
2
) -
t
D.
t
+ (
t
1
-
t
2
)
Show Answer
Scratch Pad
Discuss
Correct Answer: (
t
1
-
t
2
) -
t
3. The critical activity has
Options
A. maximum float
B. minimum float
C. zero float
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: zero float
4. An event is indicated on the network by a number enclosed in
Options
A. a circle
B. a square
C. a triangle
D. an ellipse
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
5. Railway projects are treated as
Options
A. light construction
B. heavy construction
C. industrial construction
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: heavy construction
6. A road of uniform cross-section
A
and length
L
is deformed by ?, when subjected to a normal force
P
. The Young's Modulus
E
of the material, is
Options
A.
B.
C.
D.
E.
Show Answer
Scratch Pad
Discuss
Correct Answer:
7. The locus of reaction of a two hinged semi-circular arch, is
Options
A. straight line
B. parabola
C. circle
D. hyperbola.
Show Answer
Scratch Pad
Discuss
Correct Answer: straight line
8. The forces in the members of simple trusses, may be analysed by
Options
A. graphical method
B. method of joints
C. method of sections
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
9. By applying the static equations
i.e.
?
H
= 0, ?
V
= 0 and ?
M
= 0, to a determinate structure, we may determine
Options
A. supporting reactions only
B. shear forces only
C. bending moments only
D. internal forces only
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
10. The yield moment of a cross section is defined as the moment that will just produce the yield stress in
Options
A. the outer most fibre of the section
B. the inner most fibre of the section
C. the neutral fibre of the section
D. the fibre everywhere
Show Answer
Scratch Pad
Discuss
Correct Answer: the outer most fibre of the section
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering