logo

CuriousTab

CuriousTab

Discussion


Home Civil Engineering Railways Comments

  • Question
  • For an effective administration, Indian railway system has been divided into


  • Options
  • A. four railway zones
  • B. six railway zones
  • C. seven railway zones
  • D. eight railway zones
  • E. nine railway zones.

  • Correct Answer
  • nine railway zones. 


  • Railways problems


    Search Results


    • 1. On either side of the centre line of rails, a cant of 1 in 20 in the sleeper is provided for a distance of

    • Options
    • A. 150 mm
    • B. 165 mm
    • C. 175 mm
    • D. 185 mm
    • Discuss
    • 2. Total effective bearing area of both the bowls of a pot sleeper, is

    • Options
    • A. slightly more than that of a wooden sleeper
    • B. slightly less than that of a wooden sleeper
    • C. equal to that of a wooden sleeper
    • D. none of these.
    • Discuss
    • 3. Continuity of electric current across welded rail joints, is maintained by

    • Options
    • A. welding ends of a wire to each rail
    • B. placing an insulated plate underneath the rails
    • C. placing insulation in expansion gaps
    • D. none of these.
    • Discuss
    • 4. Pick up the correct statement from the following:

    • Options
    • A. The line which connects a number of parallel tracks, and also provides an access to main track, is called a gathering line
    • B. With a diagonal gathering line, the length of the siding decreases with increase of its distance from main track
    • C. To have sidings of same length, a diagonal line is laid at one end and a parallel gathering line at the other end
    • D. For most economical layout of yards, the gathering lines are laid at the limiting angle
    • E. All the above.
    • Discuss
    • 5. Spacing of sleepers

    • Options
    • A. throughout the length of a rail is kept uniform
    • B. near rail joints, is kept closer
    • C. at the middle of rails, is kept closer
    • D. none of these.
    • Discuss
    • 6. The factor for deciding the type of sleeper, is

    • Options
    • A. easy fixing and removal of rails
    • B. provision of sufficient bearing area for rails
    • C. initial and maintenance costs
    • D. strength to act as a beam under loads
    • E. all the above.
    • Discuss
    • 7. In India, metre gauge permanent way was adopted in

    • Options
    • A. 1855
    • B. 1860
    • C. 1866
    • D. 1871
    • E. 1875
    • Discuss
    • 8. Main disadvantage of steel sleepers, is :

    • Options
    • A. it gets rusted quickly
    • B. its lugs some times get broken
    • C. its lugs some times get split
    • D. all the aboye.
    • Discuss
    • 9. Packing of ballast is done

    • Options
    • A. near the ends of sleepers
    • B. on the shoulders
    • C. under sleepers
    • D. between two rails.
    • Discuss
    • 10. To prevent creep in rails, the steel sleepers are fixed with rails by clips, bolts and

    • Options
    • A. one key
    • B. two keys
    • C. three keys
    • D. four keys.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment