CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Railways
Comments
Question
Steel sleepers are
Options
A. rectangular is cross section throughout
B. hollow circular pipes
C. 6 mm thick steel sheets with ends bent down
D. 6 mm thick steel sheets with ends bent up.
Correct Answer
6 mm thick steel sheets with ends bent down
Railways problems
Search Results
1. Widening of gauge is provided if degree of the curve, is
Options
A. 3° or less
B. 3° to
C. more than
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: more than
2. The check rails are placed opposite the crossing so that
Options
A. it is symmetrically placed opposite nose of crossing
B. its one-third length is ahead of the nose of crossing
C. its two-third length is ahead of the nose of crossing
D. its three fourth length is ahead of the nose of crossing.
Show Answer
Scratch Pad
Discuss
Correct Answer: its two-third length is ahead of the nose of crossing
3. Smitch diamond is provided if the angle of diamond is less than
Options
A. 2°
B. 4°
C. 6°
D. 8°
Show Answer
Scratch Pad
Discuss
Correct Answer: 6°
4. Rail section is generally designated by its
Options
A. total weight
B. total length
C. weight per metre length
D. area of its cross-section.
Show Answer
Scratch Pad
Discuss
Correct Answer: weight per metre length
5. Staggered rail joints are generally provided
Options
A. on curves
B. on tangents
C. on bridges
D. in tunnels.
Show Answer
Scratch Pad
Discuss
Correct Answer: on curves
6. Pick up the incorrect statement from the following. Required tilt of 1 in 20 is provided
Options
A. to the tops of rails
B. at rail seats in bearing plates
C. at rail seats in chairs
D. at rail seats in metal sleepers.
Show Answer
Scratch Pad
Discuss
Correct Answer: to the tops of rails
7. To avoid the damage of nose of crossing, the wing rails are ramped so that nose of crossing remains at a lower level by
Options
A. 3 mm
B. 4 mm
C. 5 mm
D. 6 mm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 3 mm
8. Sand may be used as ballast for
Options
A. wooden sleepers
B. steel sleepers
C. cast iron sleepers
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: cast iron sleepers
9. If
G
is gauge distance and a is crossing, the distance between the nose of acute crossing and nose of obtuse crossing of a rail diamond, measured along the rail not forming the diamond, is
Options
A.
G
cot ?
B.
G
tan ?
C.
G
sin ?
D.
G
cos ?
Show Answer
Scratch Pad
Discuss
Correct Answer:
G
cot ?
10. In a railway track, permissible gauge with tolerance under loaded condition, is
Options
A. G + 0.1 mm
B. G + 1.5 mm
C. G - l.O mm
D. G - 1.5mm
E. G - 20 mm
Show Answer
Scratch Pad
Discuss
Correct Answer: G + 1.5 mm
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering