CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Railways
Comments
Question
Staggered rail joints are generally provided
Options
A. on curves
B. on tangents
C. on bridges
D. in tunnels.
Correct Answer
on curves
Railways problems
Search Results
1. Track construction involves preparation of
Options
A. subgrade
B. plate laying
C. ballasting
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
2. Pick up the correct statement from the following:
Options
A. Length of tongue rail should be greater than rigid wheel base of vehicle
B. Stock rail should be longer than tongue rail
C. Length of stock rail ahead of the toe should be a minimum of 1.65 m
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
3. Anti-creep anchors are fixed to rails by
Options
A. wedging
B. spring grip
C. clamping
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
4. On Indian Railways, number of a crossing is defined as
Options
A. sine of angle of crossing
B. consine of angle of crossing
C. tangent of angle of crossing
D. contangent of angle of crossing.
Show Answer
Scratch Pad
Discuss
Correct Answer: contangent of angle of crossing.
5. In permanent way, ballast
Options
A. transfers load from sleepers to the formation
B. provides an elastic bed to the track
C. provides a drainage of track
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
6. Rail section is generally designated by its
Options
A. total weight
B. total length
C. weight per metre length
D. area of its cross-section.
Show Answer
Scratch Pad
Discuss
Correct Answer: weight per metre length
7. Smitch diamond is provided if the angle of diamond is less than
Options
A. 2°
B. 4°
C. 6°
D. 8°
Show Answer
Scratch Pad
Discuss
Correct Answer: 6°
8. The check rails are placed opposite the crossing so that
Options
A. it is symmetrically placed opposite nose of crossing
B. its one-third length is ahead of the nose of crossing
C. its two-third length is ahead of the nose of crossing
D. its three fourth length is ahead of the nose of crossing.
Show Answer
Scratch Pad
Discuss
Correct Answer: its two-third length is ahead of the nose of crossing
9. Widening of gauge is provided if degree of the curve, is
Options
A. 3° or less
B. 3° to
C. more than
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: more than
10. Steel sleepers are
Options
A. rectangular is cross section throughout
B. hollow circular pipes
C. 6 mm thick steel sheets with ends bent down
D. 6 mm thick steel sheets with ends bent up.
Show Answer
Scratch Pad
Discuss
Correct Answer: 6 mm thick steel sheets with ends bent down
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering