CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Railways
Comments
Question
In permanent way, ballast
Options
A. transfers load from sleepers to the formation
B. provides an elastic bed to the track
C. provides a drainage of track
D. all the above.
Correct Answer
all the above.
Railways problems
Search Results
1. Cast iron sleeper, is
Options
A. pot sleeper
B. box sleeper
C. Duplex sleeper
D. plate sleeper
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
2. The lengths of the standard crossings in India for Broad gauge and Metre gauge tracks is same for
Options
A. 1 in
B.G. and, in 12 M.G.
B. 1 in 12 B.G. and, 1 in 16 M.G.
C. 1 in 12 B.G. and 1 in
M.G.
D. 1 in 16 B.G. and 1 in 12 M.G.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1 in
B.G. and, in 12 M.G.
3. If
D
is distance between centres of two parallel tracks of gauge
G
with entire curved leads and equal angles of crossing, total length of crossover, is
Options
A.
D (4R - 2G - D)
B.
D (3R - 2G -D)
C.
D (3R + 2G - D)
D.
D (4 + 2G - D)
Show Answer
Scratch Pad
Discuss
Correct Answer:
D (4R - 2G - D)
4. The gradient on which an additonal engine is required to negotiate the gradient, is called
Options
A. momentum gradient
B. pusher gradient
C. ruling gradient
D. steep gradient.
Show Answer
Scratch Pad
Discuss
Correct Answer: pusher gradient
5. Pick up the incorrect statement from the following:
Options
A. Ends of adjoining rails should be in true alignment
B. Rail joints should be as strong as the rail section itself
C. Rail joints should be elastic laterally as well as vertically
D. Ends of adjoining rails butt against to give a continuity
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
6. On Indian Railways, number of a crossing is defined as
Options
A. sine of angle of crossing
B. consine of angle of crossing
C. tangent of angle of crossing
D. contangent of angle of crossing.
Show Answer
Scratch Pad
Discuss
Correct Answer: contangent of angle of crossing.
7. Anti-creep anchors are fixed to rails by
Options
A. wedging
B. spring grip
C. clamping
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. Pick up the correct statement from the following:
Options
A. Length of tongue rail should be greater than rigid wheel base of vehicle
B. Stock rail should be longer than tongue rail
C. Length of stock rail ahead of the toe should be a minimum of 1.65 m
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
9. Track construction involves preparation of
Options
A. subgrade
B. plate laying
C. ballasting
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
10. Staggered rail joints are generally provided
Options
A. on curves
B. on tangents
C. on bridges
D. in tunnels.
Show Answer
Scratch Pad
Discuss
Correct Answer: on curves
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering