On a single line track, 10 goods trains loaded with iron ore run from A to B and empty wagons return from B to A daily. Amount of creep of the rails will be
Options
A. zero
B. more in the direction A to B
C. more in the direction B to A
D. none of these.
Correct Answer
more in the direction A to B
More questions
1. Longitudinal pavement lines marked broken in white paint
Options
A. are for the guidance of the drivers
B. are not to be crossed over
C. may be crossed over at the discretion of the driver
9. A stratum of clay 2 m thick will get consolidated 80% in 10 years. For the 80% consolidation of 8 m thick stratum of the same clay, the time required is