CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Railways
Comments
Question
The standard width of ballast for B.G.track in Indian Railways, is kept
Options
A. 3.35 m
B. 3.53 m
C. 2.35 m
D. 2.53 m
E. none of these.
Correct Answer
3.35 m
Railways problems
Search Results
1. The grade compensation on B.G. tracks on Indian Railways, is
Options
A. 0.02%
B. 0.03%
C. 0.04%
D. 0.05%
E. 0.06%
Show Answer
Scratch Pad
Discuss
Correct Answer: 0.04%
2. Stock rails are
Options
A. parts of crossing
B. fitted against check rails
C. fitted against tongue rails
D. laid between heel of switch and nose of crossing.
Show Answer
Scratch Pad
Discuss
Correct Answer: fitted against tongue rails
3. A scissors cross over consists of one diamond and
Options
A. one turn out
B. two turn outs
C. three turn outs
D. four turn outs
E. no turn out.
Show Answer
Scratch Pad
Discuss
Correct Answer: four turn outs
4. If
S
and
H
are strength and hardness index of a timber at 12% moisture content, the composite sleeper index, is
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
5. If
D
is the distance between the parallel sidings and ? is the angle of crossing, the distance between the noses of crossing measured parallel to the gathering line, is
Options
A. D tan ?
B. D cot ?
C. D sin ?
D. D cos ?
Show Answer
Scratch Pad
Discuss
Correct Answer: D cot ?
6. If
G
is gauge is metres,
V
is speed of trains in km/hour and
R
is radius of a curve in metres, the equilibrium superelevation is
Options
A.
B.
C.
D.
E.
Show Answer
Scratch Pad
Discuss
Correct Answer:
7. The angle between the gauge faces of the stock rail and tongue rail, is called
Options
A. switch angle
B. angle of crossing
C. angle of turnout
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: switch angle
8. The place where a railway line and a road cross each other at the same level, is known as
Options
A. cross over
B. railway junction
C. road junction
D. level crossing
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: level crossing
9. Width of the top portion of a flat footed, rail, is
Options
A. 69.85 mm
B. 63.50 mm
C. 66.77 mm
D. 136.52 mm
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 66.77 mm
10. Pick up the incorrect statement from the following:
Options
A. Sleepers transfer the load of moving locomotive to the girders of the bridges
B. Sleepers act as a non-elastic medium between the rails and ballast
C. Sleepers hold the rails at 1 in 20 tilt inward
D. Sleepers hold the rails loose on curve.
Show Answer
Scratch Pad
Discuss
Correct Answer: Sleepers act as a non-elastic medium between the rails and ballast
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering