CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Irrigation
Comments
Question
Disposal of extra excavated earth of canals, is utilised to provide a spoil bank on
Options
A. left side
B. right side
C. both sides
D. all the above.
Correct Answer
all the above.
Irrigation problems
Search Results
1. Cross regulators in main canals are provided
Options
A. to regulate water supply in the distributaries
B. to increase water head upstream when a main canal is running with low supplies
C. to overflow excessive flow water
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: to increase water head upstream when a main canal is running with low supplies
2. Process of meandering is due to
Options
A. sediment load of streams
B. discharge and hydraulic properties of streams
C. relative erodibility of the bed and banks
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
3. Effective precipitation for a crop may be defined as
Options
A. total precipitation minus the loss due to evaporation
B. total precipitation minus the loss due to infiltration
C. total precipitation during the crop period
D. available water stored in soil within root zone of the crop.
Show Answer
Scratch Pad
Discuss
Correct Answer: available water stored in soil within root zone of the crop.
4. Pick up the correct statement from the following:
Options
A. Water table generally follows the ground surface above it with a few exceptions
B. Static level of water in an open well indicates the position of the water table
C. Saturated pores of a soil in the capillary zone above water table have negative pressure
D. At water table, hydrostatic pressure is zero
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
5. The width of a dowla is generally kept between 30 to 60 cm and its height above the road level should invariably be more than
Options
A. 10 cm
B. 20 cm
C. 30 cm
D. 40 cm
Show Answer
Scratch Pad
Discuss
Correct Answer: 30 cm
6. If average particle size of the silt in millimetres is m, the Lacey's silt factor
f
is proportional to
Options
A.
m
B.
m
3
C.
m
1/2
D.
m
1/3
E.
m
2/3
Show Answer
Scratch Pad
Discuss
Correct Answer:
m
1/2
7. The ratio of the head recovered to the head put in, is known as
Options
A. efficiency
B. sensitivity
C. flexibility
D. modular limit.
Show Answer
Scratch Pad
Discuss
Correct Answer: efficiency
8. The water face of the guide banks, is protected by
Options
A. one men stone pitching
B. two man stone pitching
C. three man stone pitching
D. four man stone pitching
E. five man stone pitching.
Show Answer
Scratch Pad
Discuss
Correct Answer: one men stone pitching
9. To control the silt entry into a distributary at head regulator, King's vanes are provided which are the walls
Options
A. of R.C.C. or steel plate 8 cm thick
B. of height l/3rd to l/4th the depth of water in the main canal
C. spaced at interval of
times their heights
D. extending about one metre beyond a line drawn at an inclination of 2 : 1 to the axis of main canal
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
10. In a concrete canal the approximate permissible velocity of water should not exceed
Options
A. 0.5 m/sec
B. 1 m/sec
C. 1.5 m/sec
D. 2 m/sec
E. 2.5 m/sec
Show Answer
Scratch Pad
Discuss
Correct Answer: 2 m/sec
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering