CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Irrigation
Comments
Question
The state of the soil when plants fail to extract sufficient water for their requirements, is
Options
A. maximum saturated point
B. permanent wilting point
C. ultimate utilisation point
D. none of these.
Correct Answer
none of these.
Irrigation problems
Search Results
1. The velocity of drainage water in the barrels of a syphon-aqueduct, is normally limited to
Options
A. 1 to 2 m per second
B. 2 to 3 m per second
C. 3 to 4 m per second
D. 4 to 5 m per second.
Show Answer
Scratch Pad
Discuss
Correct Answer: 2 to 3 m per second
2. Canals constructed for draining off water from water logged areas, are known
Options
A. drains
B. inundation canals
C. valley canals
D. contour canals
E. ridge canals.
Show Answer
Scratch Pad
Discuss
Correct Answer: drains
3. The most suitable location of a canal head work, is
Options
A. boulders stage of the river
B. delta stage of the river
C. rock stage of the river
D. trough stage of the river.
Show Answer
Scratch Pad
Discuss
Correct Answer: trough stage of the river.
4. If
H
and
d
are the water depth and drop in the bed level at a Sarda fall, the width
B
of the trapezoidal crest, is given by
Options
A. B = 0.22
H + d
B. B = 0.33
H + d
C. B = 0.44
H + d
D. B = 0.55
H + d
Show Answer
Scratch Pad
Discuss
Correct Answer: B = 0.55
H + d
5. If
d
1
is the depth of cutting,
d
2
is the height of the bank from bed level
r
2
: 1 and
r
1
: 1 are the slopes in filling and cutting respectively, the horizontal distance
n
between the bed and bank, is
Options
A.
x
=
r
1
d
1
B.
x
=
r
2
d
2
C.
x
=
d
1
/
r
1
D.
x
=
d
2
/
r
2
Show Answer
Scratch Pad
Discuss
Correct Answer:
x
=
r
2
d
2
6. In a barrage, the crest level is kept
Options
A. low with large gates
B. high with large gates
C. high with no gates
D. low with no gates.
Show Answer
Scratch Pad
Discuss
Correct Answer: low with large gates
7. A deficit of sediments in flowing water may cause a river
Options
A. meandering type
B. aggrading type
C. degrading type
D. sub-critical type.
Show Answer
Scratch Pad
Discuss
Correct Answer: degrading type
8. The width of a meander belt is the transverse distance between
Options
A. apex point of one curve and apex point of the reserve curve
B. apex point and the crossing
C. two banks of meandering river
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: apex point of one curve and apex point of the reserve curve
9. Bed bars in a canal are provided
Options
A. to watch the general behaviour of canal
B. to measure the discharge
C. to raise the supply level
D. to control the silting
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: to watch the general behaviour of canal
10. Pick up the correct statement from the following:
Options
A. The full supply level of a canal should be above ground level
B. According to Lacey, regime conditions require a particular slope for a given discharge and silt factor
C. In case the ground slope is less than the required bed slope, the silt factor must be reduced by permitting the entry of coarse silt
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering