logo

CuriousTab

CuriousTab

Discussion


Home Civil Engineering Waste Water Engineering Comments

  • Question
  • The sewer that unloads the sewage at the point of treatment is called


  • Options
  • A. main sewer
  • B. outfall sewer
  • C. branch sewer
  • D. house sewer.

  • Correct Answer
  • outfall sewer 


  • Waste Water Engineering problems


    Search Results


    • 1. If the flame of a miner's safety lamp in the upper layers of the sewer forms an explosive, the sewer certainly contains

    • Options
    • A. Hydrogen sulphide
    • B. Carbon dioxide
    • C. Methane
    • D. Oxygen
    • E. None of these.
    • Discuss
    • 2. The coagulant which is generally not used for treating the sewage, is

    • Options
    • A. alum
    • B. ferric chloride
    • C. ferric sulphate
    • D. chlorinated copperas.
    • Discuss
    • 3. A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is

    • Options
    • A. 2.30 m
    • B. 2.40 m
    • C. 2.45 m
    • D. 2.50 m.
    • Discuss
    • 4. If the flame of a miner's safety lamp in a manhole extinguishes within 5 minutes, the sewer certainly contains

    • Options
    • A. Hydrogen sulphide
    • B. Carbon dioxide
    • C. Methane
    • D. Oxygen
    • E. None of these.
    • Discuss
    • 5. R.M.O. expenses include

    • Options
    • A. running expenses
    • B. maintenance expenses
    • C. operation expenses
    • D. all the above.
    • Discuss
    • 6. The grit chambers of sewage treatment plants, are generally cleaned after

    • Options
    • A. 2 days
    • B. 5 days
    • C. 7 days
    • D. 12 days
    • E. 14 days.
    • Discuss
    • 7. Fresh sewage is generally

    • Options
    • A. alkaline
    • B. acidic
    • C. highly decomposed
    • D. a source of objectionable odour.
    • Discuss
    • 8. The spacing of bars for perforations in coarse screens used for the treatment of sewage, is

    • Options
    • A. 20 mm
    • B. 30 mm
    • C. 40 mm
    • D. 50 mm
    • E. 100 mm.
    • Discuss
    • 9. For a continuous flow type of sedimentation tanks

    • Options
    • A. width of the tank is normally kept about 6 m
    • B. length of the tank is normally kept 4 to 5 times the width
    • C. maximum horizontal flow velocity is limited to 0.3 m/minute
    • D. capacity of the tank for 24 hours, is kept equal to maximum daily flow of sewage
    • E. all the above.
    • Discuss
    • 10. Pick up the incorrect statement from the following :

    • Options
    • A. The mixture of water and waste products, is called sewage
    • B. The treated sewage effluents, are generally used for irrigating the crops
    • C. The process of collecting, treating and disposing off the sewage, is called sewerage
    • D. The old convergency system was definitely better than water carried sewerage system
    • E. None of these.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment