CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Waste Water Engineering
Comments
Question
rd or
th extra space is left in sewer pipes at maximum discharge for
Options
A. low estimates of the average and maximum flows
B. large scale infiltration of storm water
C. unexpected increase in population
D. all the above.
Correct Answer
all the above.
Waste Water Engineering problems
Search Results
1. Antisyphonage pipe is fitted
Options
A. at the end of septic tanks
B. on manholes
C. with a W.C. trap
D. at the beginning of sewer line.
Show Answer
Scratch Pad
Discuss
Correct Answer: with a W.C. trap
2. The rational formula for peak drainage discharge, was evolved by
Options
A. Fruhling
B. Lloyd David
C. Kuichling
D. All of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: All of these.
3. Sewer pipes need be checked for
Options
A. minimum flow
B. maximum flow
C. both (a) and (b)
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: both (a) and (b)
4. The ratio of design discharge to the surface area of a sedimentation tank is called
Options
A. surface loading
B. overflow rate
C. overflow velocity
D. all of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these.
5. Hume steel pipes are
Options
A. steel pipes
B. R.C.C. pipes
C. steel shell coated from inside with cement mortar
D. steel shell coated from outside with cement mortar
E. both (c) and (d).
Show Answer
Scratch Pad
Discuss
Correct Answer: both (c) and (d).
6. The minimum diameter of a sewer is kept
Options
A. 10 cm
B. 15 cm
C. 20 cm
D. 25 cm
E. 30 cm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 15 cm
7. The minimum diameter of sewer to be adopted is
Options
A. 10 cm
B. 12.5 cm
C. 15 cm
D. 25 cm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 15 cm
8. In the activated sludge process
Options
A. aeration is continued till stability
B. aeration is done with an admixture of previously aerated sludge
C. sludge is activated by constant stirring
D. water is removed by centrifugal action.
Show Answer
Scratch Pad
Discuss
Correct Answer: aeration is done with an admixture of previously aerated sludge
9. Drop manholes are the manholes
Options
A. without entry ladders
B. without manhole covers
C. with depths more than 3.5 m
D. having drains at different levels.
Show Answer
Scratch Pad
Discuss
Correct Answer: having drains at different levels.
10. The suitable cross-section of sewers to carry combined flow, is
Options
A. circular
B. egg shaped
C. rectangular
D. horse shoe shaped.
Show Answer
Scratch Pad
Discuss
Correct Answer: egg shaped
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering