  • Question
  • Antisyphonage pipe is fitted


  • Options
  • A. at the end of septic tanks
  • B. on manholes
  • C. with a W.C. trap
  • D. at the beginning of sewer line.

  • Correct Answer
  • with a W.C. trap 


  • Waste Water Engineering problems


    Search Results


    • 1. The rational formula for peak drainage discharge, was evolved by

    • Options
    • A. Fruhling
    • B. Lloyd David
    • C. Kuichling
    • D. All of these.
    • Discuss
    • 2. Sewer pipes need be checked for

    • Options
    • A. minimum flow
    • B. maximum flow
    • C. both (a) and (b)
    • D. none of these.
    • Discuss
    • 3. The ratio of design discharge to the surface area of a sedimentation tank is called

    • Options
    • A. surface loading
    • B. overflow rate
    • C. overflow velocity
    • D. all of these.
    • Discuss
    • 4. Hume steel pipes are

    • Options
    • A. steel pipes
    • B. R.C.C. pipes
    • C. steel shell coated from inside with cement mortar
    • D. steel shell coated from outside with cement mortar
    • E. both (c) and (d).
    • Discuss
    • 5. In a sedimentation tank (length L, width B, depth D) the settling velocity of a particle for a discharge Q, is

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 6.  rd or th extra space is left in sewer pipes at maximum discharge for

    • Options
    • A. low estimates of the average and maximum flows
    • B. large scale infiltration of storm water
    • C. unexpected increase in population
    • D. all the above.
    • Discuss
    • 7. The minimum diameter of a sewer is kept

    • Options
    • A. 10 cm
    • B. 15 cm
    • C. 20 cm
    • D. 25 cm
    • E. 30 cm.
    • Discuss
    • 8. The minimum diameter of sewer to be adopted is

    • Options
    • A. 10 cm
    • B. 12.5 cm
    • C. 15 cm
    • D. 25 cm.
    • Discuss
    • 9. In the activated sludge process

    • Options
    • A. aeration is continued till stability
    • B. aeration is done with an admixture of previously aerated sludge
    • C. sludge is activated by constant stirring
    • D. water is removed by centrifugal action.
    • Discuss
    • 10. Drop manholes are the manholes

    • Options
    • A. without entry ladders
    • B. without manhole covers
    • C. with depths more than 3.5 m
    • D. having drains at different levels.