CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Waste Water Engineering
Comments
Question
For design of sewers, percentage of sewage discharge is assumed
Options
A. 65 to 70%
B. 70 to 75%
C. 75 to 80%
D. 85%.
Correct Answer
75 to 80%
Waste Water Engineering problems
Search Results
1. The gas evolved in sewers is
Options
A. Carbondioxide
B. Hydrogen sulphide
C. Methane
D. All of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: All of these.
2. The sewerage system originates from
Options
A. house sewers
B. lateral sewers
C. branch sewers
D. main sewers
E. out fall sewers.
Show Answer
Scratch Pad
Discuss
Correct Answer: house sewers
3. A well oxidized sewage contains nitrogen mainly as
Options
A. nitrates
B. nitrites
C. free ammonia
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: nitrates
4. During putrifaction process of sewage the gas given off, is
Options
A. carbon dioxide
B. hydrogen
C. ammonia
D. methane
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
5. The angle subtended by the surface of sewer water with partial flow, at sewer centre is 120°, the depth of sewerage is
Options
A. 20 cm
B. 25 cm
C. 40 cm
D. 50 cm
E. 60 cm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 50 cm
6. For a peak discharge of 0.0157 cumec, with a velocity of 0.9 m/sec, the diameter of the sewer main, is
Options
A. 10 cm
B. 12 cm
C. 15 cm
D. 18 cm
E. 20 cm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 15 cm
7. A circular sewer section is preferred to because
Options
A. it is cheaper in construction
B. it provides maximum area for a given perimeter
C. it provides maximum hydraulic mean depth
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. The sewer which transports the sewage to the point of treatment, is called
Options
A. house sewer
B. out-fall sewer
C. branch sewer
D. lateral
E. main sewer.
Show Answer
Scratch Pad
Discuss
Correct Answer: out-fall sewer
9. The porosity of sediments in sewer pipes, is usually taken as
Options
A. 0.010
B. 0.011
C. 0.012
D. 0.013
E. 0.020
Show Answer
Scratch Pad
Discuss
Correct Answer: 0.013
10. You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at
Options
A. full depth
B. half full
C. two third full
D. three fourth full.
Show Answer
Scratch Pad
Discuss
Correct Answer: half full
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering