CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Waste Water Engineering
Comments
Question
For sewer mains of 0.5 to 1 m diameter, the ratio of maximum daily sewage flow to the average daily sewage flow is assumed
Options
A. 1.5
B. 2.0
C. 2.5
D. 3.0
Correct Answer
2.0
Waste Water Engineering problems
Search Results
1. Pick up the correct statement from the following :
Options
A. The ratio of the quantity of the diluting water to that of the sewage, is known as dilution factor
B. The automatic purification of polluted water, is known self purification phenomenon
C. The photosynthesis is carried out in the presence of sun light
D. Grab sample is generally obtained from the surface where turbulence mixes the sewage particles
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
2. The design period of sewage treatment works in normally
Options
A. 5 - 10 years
B. 15 - 20 years
C. 30 - 40 years
D. 40 - 50 years.
Show Answer
Scratch Pad
Discuss
Correct Answer: 15 - 20 years
3. Lead caulked joints are used for laying
Options
A. stone ware pipes
B. earthern ware pipes
C. C.I. pipes
D. G.I. pipes.
Show Answer
Scratch Pad
Discuss
Correct Answer: earthern ware pipes
4. The maximum diameter of sewers adopted in the designs is
Options
A. 1.0 m
B. 2.0 m
C. 3.0 m
D. 4.0 m.
Show Answer
Scratch Pad
Discuss
Correct Answer: 3.0 m
5. Dried sewage after treatment is used as
Options
A. fertilizer
B. building material
C. chemical for lowering B.O.D.
D. base material for paints.
Show Answer
Scratch Pad
Discuss
Correct Answer: fertilizer
6. If
D
is the diameter of upper circular portion, the area of cross-section of a standard egg shaped sewer, is
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
7. The sewer which received discharge from two or more main sewers, is known as
Options
A. a trunk sewer
B. an outfall sewer
C. a main sewer
D. an intercepting sewer.
Show Answer
Scratch Pad
Discuss
Correct Answer: a trunk sewer
8. The stone ware sewers
Options
A. are used for carrying sewage and drainage from houses
B. are manufactured from clays and shales
C. after casting are dried and burnt at temperature 150°C, 700°C and 1200°C
D. are generally provided with a water proof cover by vaporising sodium chloride
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
9. If
D
is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is
Options
A. 1.250
D
B. 1.350
D
C. 1.425
D
D. 1.625
D
.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1.625
D
.
10. If the grit in grit chambers is 4.5 million litres per day, its cleaning is done
Options
A. manually
B. mechanically
C. hydraulically
D. electrically.
Show Answer
Scratch Pad
Discuss
Correct Answer: manually
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering