CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Waste Water Engineering
Comments
Question
For providing an Indian type W.C., the R.C.C. slabs in the toilet portion
Options
A. should be sunk by 20 cm
B. should be kept 20 cm above the adjacent portion
C. should be sunk by 50 cm
D. need not be sunk.
Correct Answer
should be sunk by 50 cm
Waste Water Engineering problems
Search Results
1. Pick up the incorrect statement from the following :
Options
A. Septic tanks are horizontal continuous flow type of sedimentation tanks
B. Septic tanks are generally provided a detention period of 12 to 36 hours
C. Septic tanks are completely covered and high vent shafts are provided for the escape of foul gases
D. Septic tanks are generally classified as tanks which work on the principle of anaerobic decomposition
E. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: None of these.
2. For design purposes, the normal rate of infiltration of ground water into the sewer, is
Options
A. 500 litres/km/cm
B. 1000 litres/km/cm
C. 1500 litres/km/cm
D. 2000 litres/km/cm
E. 2500 litres/km/cm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 2000 litres/km/cm
3. The gradient of sewers depends upon
Options
A. velocity of flow
B. diameter of the sewer
C. discharge
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
4. The most dangerous pollutant in vehicular emissions is
Options
A. CO
B. SO
2
C. CO
2
D. O
3
.
Show Answer
Scratch Pad
Discuss
Correct Answer: CO
5. The recommended detention period for grit chambers is
Options
A. 1 minute
B. 2 minutes
C. 3 minutes
D. 5 minutes.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1 minute
6. Pick up the correct statement from the following :
Options
A. The maximum rate of storm run off is called peak drainage discharge
B. Rational method of estimating peak run off, may be used precisely for areas less than 50 hectares
C. The period after which the entire area starts contributing to the run off, is called the time of concentration
D. The time required by water to reach the outlet of a catchment from the most remote point, is called time of concentration
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
7. The small sewers are cleaned by
Options
A. flushing
B. cane rodding
C. wooden pills
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: flushing
8. For a circular sewer of diameter
D
running partially full with central angle ?,
Options
A.
B.
C.
D.
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
9. The factor responsible for purification of sewage in river is
Options
A. Hydrology
B. Dissolved oxygen in water
C. Temperature
D. Turbulence
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
10. In circular sewers if depth of flow is 0.2 times the full depth, the nominal gradient,
Options
A. is only provided
B. is doubled
C. is trebled
D. is not enough.
Show Answer
Scratch Pad
Discuss
Correct Answer: is doubled
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering