CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Waste Water Engineering
Comments
Question
Fresh sewage may become stale in
Options
A. one hour
B. two to three hours
C. three to four hours
D. six hours.
E. ten hours.
Correct Answer
three to four hours
Waste Water Engineering problems
Search Results
1. If the depth of partial flow in a sewer of diameter 2 m, is 50 cm, its wetted perimeter is
Options
A. ?
B.
C.
D.
E.
Show Answer
Scratch Pad
Discuss
Correct Answer:
2. Pick up the correct statement from the following :
Options
A. Indore method of composting involves decomposition under aerobic conditions
B. Bangalore method of composting involves decomposing under anaerobic conditions
C. Fully stabilised refuse by the Bangalore method of compositing is a powdery mass called humus
D. all of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these.
3. The algae dies out in the zone of
Options
A. degradation
B. active decomposition
C. recovery
D. cleaner water.
Show Answer
Scratch Pad
Discuss
Correct Answer: degradation
4. Maximum permissible velocity 1.5 m/sec, is adopted in drains
Options
A. with beds of rocks and gravels
B. lined with stones
C. both (a) and (b)
D. neither (a) nor (b).
Show Answer
Scratch Pad
Discuss
Correct Answer: both (a) and (b)
5. In sewers the gas generally found, is
Options
A. Hydrogen sulphide (H
2
S)
B. Carbon dioxide (CO
2
)
C. Methane (CH
4
)
D. Petrol vapours
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
6. The liquid wastes from kitchens, bath rooms and wash basins, is not called
Options
A. liquid waste
B. sullage
C. sewage
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: sewage
7. Rate of flow of sewage is generally assumed
Options
A. more than the rate of water supply
B. equal to the rate of water supply
C. less than the rate of water supply
D. at 150 litres per capita.
Show Answer
Scratch Pad
Discuss
Correct Answer: less than the rate of water supply
8. Which one of the following tests is used for testing sewer pipes :
Options
A. water test
B. ball test
C. mirror test
D. all of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these.
9. Hydraulic mean radius is
Options
A. mean radius of sewer
B. difference in heads between two points in circular pipes
C. mean of radii in a pipe line of varying cross-sections
D. cross-sectional area/wetted perimeter.
Show Answer
Scratch Pad
Discuss
Correct Answer: cross-sectional area/wetted perimeter.
10. A sewer running partially full and hurried with back filled, fails in compression due to
Options
A. weight of the pipe
B. weight of the back fill
C. superimposed traffic loads
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering