The distances AC and BC are measured from two fixed points A and B whose distance AB is known. The point C is plotted by intersection. This method is generally adopted in
Options
A. chain surveying
B. traverse method of surveys
C. triangulation
D. none of these.
Correct Answer
chain surveying
More questions
1. If H and d are the water depth and drop in the bed level at a Sarda fall, the width B of the trapezoidal crest, is given by
9. If the length of a transition curve to be introduced between a straight and a circular curve of radius 500 m is 90 m, the maximum perpendicular offset for the transition curve, is