  • For locating a distant object visible from two transit stations, the method usually preferred to, is


  • Options
  • A. Angles and distances from transit stations
  • B. Angles from two transit stations
  • C. distance from two transit stations
  • D. Angle from one transit station and distance from the other.

  • Correct Answer
  • Angles from two transit stations 


  • Surveying problems


    Search Results


    • 1. A sewer is laid from a manhole A to a manhole B, 250 m away along a gradient of 1 in 125. If the reduced level of the invert at A is 205.75 m and the height of the boning rod is 3 m, the reduced level of the sight rail at B, is

    • Options
    • A. 208.75 m
    • B. 202.75 m
    • C. 206.75 m
    • D. 211.75 m
    • Discuss
    • 2. The distance between terminal points computed from a subsidiary traverse run between them, is generally known, as

    • Options
    • A. traverse leg
    • B. a base
    • C. traverse base
    • D. all the above.
    • Discuss
    • 3. Check lines (or proof lines) in Chain Surveying, are essentially required

    • Options
    • A. to plot the chain lines
    • B. to plot the offsets
    • C. to indicate the accuracy of the survey work
    • D. to increase the out-turn
    • Discuss
    • 4. Pick up the correct statement from the following

    • Options
    • A. 1 second of arc corresponds to a displacement ratio of 1:206, 300
    • B. 1 degree of arc corresponds to a displacement ratio of 1:57
    • C. the angular errors tend to propagate themselves along a traverse as the square root of the number of stations
    • D. the errors arising from the linear measures tend to be roughly proportional to the lengths of the lines
    • E. all the above.
    • Discuss
    • 5. The operation of resection involves the following steps

      1. rough orientation of the plane table
      2. the three lines form a triangle of error
      3. drawing lines back through the three control points
      4. select a point in the triangle of error such that each ray is equally rotated either clockwise or anti clockwise
      5. the points obtained by three rays is the correct location.

      The correct sequence is

    • Options
    • A. 1, 3, 2, 4, 5
    • B. 1, 2, 3, 4, 5
    • C. 1, 4, 3, 2, 5
    • D. 1, 4, 2, 3, 5
    • Discuss
    • 6. Chain surveying is well adopted for

    • Options
    • A. small areas in open ground
    • B. small areas with crowded details
    • C. large areas with simple details
    • D. large areas with difficult details.
    • Discuss
    • 7. The line of collimation method of reduction of levels, does not provide a check on

    • Options
    • A. intermediate sights
    • B. fore sights
    • C. back sights
    • D. reduced levels.
    • Discuss
    • 8. Short offsets are measured with

    • Options
    • A. an ordinary chain
    • B. an invar tape
    • C. a metallic tape
    • D. a steel tape.
    • Discuss
    • 9. The approximate formula for radial or perpendicular offsets from the tangent, is

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 10. Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units, is

    • Options
    • A.
    • B. 100 n2
    • C.
    • D. .
    • Discuss


    Comments

    There are no comments.

Enter a new Comment