logo

CuriousTab

CuriousTab

Discussion


Home Civil Engineering Surveying Comments

  • Question
  • Angles to a given pivot station observed from a number of traverse stations when plotted, the lines to the pivot station intersect at a common point


  • Options
  • A. angular measurements are correct and not the linear measurements
  • B. linear measurements are correct and not the angular measurements
  • C. angular and linear measurements are correct and not the plotting of traverse
  • D. angular and linear measurements and also plotting of the traverse are correct.

  • Correct Answer
  • angular and linear measurements and also plotting of the traverse are correct. 


  • Surveying problems


    Search Results


    • 1. If h is the difference in height between end points of a chain of length l, the required slope correction is

    • Options
    • A.
    • B.
    • C.
    • D. .
    • Discuss
    • 2. Flint glass

    • Options
    • A. has slightly the greater refracting power than crown glass
    • B. has roughly double refracting power than that of crown
    • C. and crown glass proportions yield the required focal length and neutralise the dispersion produced by the convex lens at the emergence from the concave
    • D. all the above.
    • Discuss
    • 3. Accuracy of elevation of various points obtained from contour map is limited to

    • Options
    • A. of the contour interval
    • B. th of the contour interval
    • C. rd of the contour interval
    • D. th of the contour interval.
    • Discuss
    • 4. The method of finding out the difference in elevation between two points for eliminating the effect of curvature and refraction, is

    • Options
    • A. reciprocal levelling
    • B. precise levelling
    • C. differential levelling
    • D. flying levelling
    • Discuss
    • 5. The co-ordinate of a point measured perpendicular to the parallel, is called

    • Options
    • A. total latitude
    • B. meridian distance
    • C. total departure
    • D. consecutive co-ordinate.
    • Discuss
    • 6. For preparation of a contour plan for a route survey

    • Options
    • A. method of squares is used
    • B. method of trace contour is used
    • C. method of cross profile is used
    • D. indirect method of contouring is used.
    • Discuss
    • 7. Reduced bearing of a line is an angle between

    • Options
    • A. north line and given line measured clockwise
    • B. north line and given line measured anticlockwise
    • C. east or west and the given line
    • D. given line and the part of the meridian whether N end or S end, lying adjacent to it.
    • Discuss
    • 8. Magnetic bearing of a survey line at any place

    • Options
    • A. remains constant
    • B. changes systematically
    • C. varies differently in different months of the year
    • D. is always greater than true bearing.
    • Discuss
    • 9. The horizontal angle between true meridian and magnetic meridian, is known

    • Options
    • A. bearing
    • B. magnetic declination
    • C. dip
    • D. convergence.
    • Discuss
    • 10. ABCD is a rectangular plot of land. If the bearing of the side AB is 75°, the bearing of DC is

    • Options
    • A. 75°
    • B. 255°
    • C. 105°
    • D. 285°
    • Discuss


    Comments

    There are no comments.

Enter a new Comment