Correct Answer: gradual increase of super-elevation from zero at the tangent point to the specified amount at the junction of the transition curve with main curve
9. If the engineer-in-charge approves, the 10 cm cubes may be used for the work test of concrete provided maximum nominal size of aggregate, does not exceed