CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Building Materials
Comments
Question
Invar contains
Options
A. 12% of nickel
B. 24% of nickel
C. 30% to nickel
D. 36% of nickel.
Correct Answer
36% of nickel.
Building Materials problems
Search Results
1. Pig iron is manufactured from the ores by
Options
A. dressing
B. calcination and roasting
C. smelting
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
2. PVC stands for
Options
A. plastic very compact
B. polythene vinyl chloride
C. polythene vinyl carbon
D. polythene vanadium carbide.
Show Answer
Scratch Pad
Discuss
Correct Answer: polythene vinyl chloride
3. Calcination of iron ores is done
Options
A. to remove moisture
B. to remove carbonic acid
C. by roasting in heaps
D. after dressing
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
4. Cement paints usually
Options
A. contain hydrated lime
B. contain 5% to 10% colour pigments
C. are prepared with white cement
D. contain 5% sodium chloride
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
5. Pick up the correct statement from the following:
Options
A. Slaked lime contains calcium hydroxide
B. Quick lime contains calcium oxide
C. Slaked lime may be obtained from quick lime
D. Slaked lime is obtained by adding water to quick lime
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
6. The percentage of water for normal consistency, is
Options
A. 5% to 15%
B. 10% to 25%
C. 15% to 25%
D. 20% to 30%
E. 25% to 35%.
Show Answer
Scratch Pad
Discuss
Correct Answer: 15% to 25%
7. The initial setting time of hydraulic lime, is
Options
A. 30 minutes
B. 60 minutes
C. 90 minutes
D. 120 minutes
E. 150 minutes.
Show Answer
Scratch Pad
Discuss
Correct Answer: 120 minutes
8. Plywood is obtained by gluing wooden sheets at
Options
A. 100 to 150 N/cm
2
B. 100 to 130°C
C. both (a) and (b)
D. Neither (a) nor (b).
Show Answer
Scratch Pad
Discuss
Correct Answer: both (a) and (b)
9. Pick up the correct statement from the following:
Options
A. The baked earth is called terra-cotta
B. The articles prepared from clay which is burnt at low temperature and cooled down slowly, are called earthen-ware
C. The articles prepared from refractory clays which as mixed with stone and crushed pottery, are called stone ware
D. The articles prepared from fine earthen ware which is white, thin and semi-transparent, are called procelain
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
10. Based on flow quality, the sequence of pipes is
Options
A. A.C. pipes, G.I. pipes, C.I. pipes, PVC pipes
B. C.I. pipes, G.I. pipes, A.C. pipes, PVC pipes
C. C.I. pipes, G.I. pipes, PVC pipes, A.C. pipes
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: C.I. pipes, G.I. pipes, A.C. pipes, PVC pipes
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering