CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Building Materials
Comments
Question
The minimum compressive strength of Ilnd class bricks should be
Options
A. 75 kg/cm
2
B. 90 kg/cm
2
C. 100 kg/cm
2
D. 120 kg/cm
2
E. 150 kg/cm
2
.
Correct Answer
75 kg/cm
2
Building Materials problems
Search Results
1. The process of decarbonising the pig iron completely and then adding proper percentage of carbon for manufacturing steel, is called
Options
A. Cementation process
B. crucible process
C. Bessemer process
D. Open hearth process.
Show Answer
Scratch Pad
Discuss
Correct Answer: Cementation process
2. During pudding
Options
A. molten metal is kept clear of the fuel
B. carbon is converted into carbonic acid gas
C. silicon forms a slag
D. metal is heated by the burning of gases
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
3. Pick up the correct statement from the following:
Options
A. Corrugated sheet iron is made by passing plain sheets between grooved rollers
B. Strength and stiffness of corrugated sheets are considerably increased
C. Corrugated sheets are generally gal-venised to protect iron from corrosion by rust
D. Corrugated sheets are generally used on slanting roofs
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
4. Pick up the correct statement from the following:
Options
A. Quick lime is obtained by burning pure lime stone:
B. Hydraulic lime is obtained by burning lime stone containing clay 5% to 30%
C. Poor lime is obtained by burning lime stone containing impurities more than 5%
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
5. The normal curing period for lime mortar, is:
Options
A. one day
B. 3 days
C. 7 days
D. 10 days
E. 14 days.
Show Answer
Scratch Pad
Discuss
Correct Answer: 7 days
6. Fibre boards can be
Options
A. distempered
B. painted
C. painted and distempered
D. used for furniture.
Show Answer
Scratch Pad
Discuss
Correct Answer: used for furniture.
7. Pick up the incorrect statement from the following:
Options
A. Plastics are chemical resistant
B. Plastics are durable
C. Plastics are ductile
D. Plastics are excellent electric insulators.
Show Answer
Scratch Pad
Discuss
Correct Answer: Plastics are ductile
8. If water required for 1 bag of cement is 30 litres, the water cement ratio is :
Options
A. 0.40
B. 0.50
C. 0.60
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 0.60
9. Which one of the following polymers is obtained from condensation polymerization?
Options
A. phenol formaldehyde
B. carbamide
C. melamine-formaldehyde
D. all of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these.
10. Bituminous fells are used for
Options
A. covering A.C. sheets
B. covering sloping roofs
C. D.P.C.
D. none to these.
Show Answer
Scratch Pad
Discuss
Correct Answer: covering A.C. sheets
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering