logo

CuriousTab

CuriousTab

Discussion


Home Computer Science System Analysis and Design Comments

  • Question
  • To run the old system and the new system at the same time for a specified period, the system implementation approach used is


  • Options
  • A. pilot
  • B. phased
  • C. parallel
  • D. direct
  • E. None of the above

  • Correct Answer
  • parallel 


  • System Analysis and Design problems


    Search Results


    • 1. During the system study, the executive vice-president and the other managers exercise their responsibility of

    • Options
    • A. planning
    • B. controlling
    • C. directing
    • D. organizing
    • E. None of the above
    • Discuss
    • 2. An example of a hierarchical data structure is

    • Options
    • A. array
    • B. link list
    • C. tree
    • D. All of the above
    • E. None of the above
    • Discuss
    • 3. The _____ symbol is used in a flowchart to represent a step that gets information from the user.

    • Options
    • A. Input/Output
    • B. Process
    • C. Selection/repetition
    • D. Start/Stop
    • E. None of the above
    • Discuss
    • 4. Positive testing is

    • Options
    • A. running the system with line data by the actual user
    • B. making sure that the new programs do in fact process certain transactions according to Specifications
    • C. is checking the logic of one or more programs in the candidate system
    • D. testing changes made in an existing or a new program
    • E. None of the above
    • Discuss
    • 5. System Study involves

    • Options
    • A. study of an existing system
    • B. documenting the existing system.
    • C. identifying current deficiencies and establishing new goals
    • D. All of the above
    • E. None of the above
    • Discuss
    • 6. Which of the following statements, is (are) not true for the lease option

    • Options
    • A. Lease charges are lower than rental charges for the same period and are also tax deductable.
    • B. Lease may be written to show higher payments is early years to reflect the decline in value of the system
    • C. Insurance, maintenance and other expenses are included in the rental charge
    • D. All of the above
    • E. None of the above
    • Discuss
    • 7. Documentation is prepared

    • Options
    • A. at every stage
    • B. at system design
    • C. at system analysis
    • D. at system development
    • E. None of the above
    • Discuss
    • 8. Which of the following is not a characteristic of good test data

    • Options
    • A. users do not participate at this preliminary stage
    • B. should be comprehensive
    • C. every statement should be executed
    • D. All of the above
    • E. None of the above
    • Discuss
    • 9. Acceptance testing is

    • Options
    • A. running the system with line data by the actual user
    • B. making sure that the new programs do in fact process certain transactions according to Specifications
    • C. is checking the logic of one or more programs in the candidate systems
    • D. testing changes made in an existing or a new program
    • E. None of the above
    • Discuss
    • 10. Top-down programming is

    • Options
    • A. a group of related fields
    • B. a map of the programmer's view of the data
    • C. an approach in which the top module is first tested then program modules are added from the highest level to the lowest level
    • D. a series or group of components that perform one or more operations of a more complex system
    • E. None of the above
    • Discuss


    Comments

    There are no comments.

Enter a new Comment