CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Computer Science
‣
Management Information Systems
Comments
Question
The four major corporate resources are money, materials, information, and
Options
A. people
B. icons
C. information system
D. on-line
E. None of the above
Correct Answer
people
Management Information Systems problems
Search Results
1. Critical path of the PERT chart is:
Options
A. path which takes the longest time to complete the project
B. the shortest path
C. both of the above
D. path which takes the shortest time to complete the project
E. None of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: path which takes the longest time to complete the project
2. Error reports are an example of:
Options
A. scheduled reports
B. demand reports
C. exception reports
D. predictive reports
E. management reports
Show Answer
Scratch Pad
Discuss
Correct Answer: exception reports
3. The online, softcopy display of a customer's charge account to respond to an inquiry is an example of a(n):
Options
A. regularly scheduled report
B. on-demand report
C. exception report
D. forecasting report
E. None of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: on-demand report
4. A _____ is a brief message to an operator that describes what data are to be entered.
Options
A. prompt
B. passwords
C. MIS
D. Tactical
E. None of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: prompt
5. Order-filling activity in the physical system is triggered by the
Options
A. manufacturing information system
B. order entry subsystem
C. billing subsystem
D. accounts receivable subsystem
E. None of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: billing subsystem
6. _____ are knowledge based system to which present rules are applied to solve a particular problem.
Options
A. ES
B. AI
C. KBS
D. Base rule 0
E. None of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: ES
7. An optional facilitates location program can be used to study
Options
A. factory location alternative
B. warehouse location alternatives
C. plant location alternatives
D. All of the above
E. None of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: All of the above
8. The product structure file is also called the
Options
A. item master file
B. bill of materials file
C. operations file
D. All of the above
E. None of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: bill of materials file
9. Which of the following is not an important principle for evaluating the raw data for decision-making:
Options
A. selection
B. pattern
C. everage
D. overview
E. None of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: everage
10. If you are an information-system manager, which organization is most appropriate for your interest?
Options
A. ACM
B. SIM
C. ASA
D. IEEE
E. None of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: SIM
Comments
There are no comments.
Enter a new Comment
Save
More in Computer Science:
Artificial Intelligence
Automation System
Computer Fundamentals
Computer Hardware
Database Systems
Digital Computer Electronics
Disk Operating System (DOS)
Electronic Principles
Language Processors
Linux
Management Information Systems
Networking
Object Oriented Programming Using C++
Operating Systems Concepts
System Analysis and Design
Unix
Windows 2000 Server
Windows NT