Suppose that you have a the maintenance package identifies several possible field replaceable units (FRUs) that will resolve the problem. What should you do after turning the power off?
Options
A. Replace the indicated parts, one at a time in the recommended sequence, until the problem is resolved; return unused FRUs to stock
B. Replace all of the indicated FRUs at once and return the machine to the customer if the problem is resolved
C. Follow the same procedure as in ays replace the system board first if it is on the list of possible FRUs If multiple FRUs are indicated, then software is the most likely source of the problem
D. None of the above
Correct Answer
Replace the indicated parts, one at a time in the recommended sequence, until the problem is resolved; return unused FRUs to stock
More questions
1. A workstation has just been installed on an Ethernet LAN, but cannot communicate with the network. What should you check first?
Options
A. reinstall the network protocols
B. reinstall the network interface card driver
C. verify the ip configuration on the workstation
D. verify the link status on the computer's network card