  • Question
  • Both architect and engineer make use of the cost estimate of the project:


  • Options
  • A. for site selection
  • B. for designing of the project
  • C. for choosing alternatives
  • D. All of these

  • Correct Answer
  • All of these 


  • Engineering Economy problems


    Search Results


    • 1. If interest is paid more than once in a year, i is the rate of interest per year, n is the number of periods in years and m is a number of periods per years, compound amount factor (CAF) is :

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 2. Pick up the correct statement from the following:

    • Options
    • A. Ratio analysis is the procedure of determining and interpreting numerical relationship of various items of the financial statement.
    • B. All financial ratios are obtained by relating two sets of information contained in a Single financial statement.
    • C. The relationship between two accounting figures expressed mathematically, is known as a financial ratio.
    • D. All of these
    • Discuss
    • 3. The interest calculated on the basis of 365 days a year, is known as :

    • Options
    • A. interest
    • B. ordinary simple interest
    • C. exact simple interest
    • D. None of these
    • Discuss
    • 4. The ratio of current assests to current liabilities is known as

    • Options
    • A. Liquidity ratio
    • B. Current ratio
    • C. Acid-Test (or Quick) ratio
    • D. Debts ratio
    • Discuss
    • 5. Pick up the correct statement from the following:

    • Options
    • A. A NPV profile graph shows the curvilinear relationship between the net present value of the project and discount rate employed.
    • B. In a NPV profile, if discount rate is zero, then net present value is simply total cash inflows less the total cash outflows of the project.
    • C. As the discount rate increases, the net present value profile slopes downward to the right.
    • D. All of these
    • Discuss
    • 6. Ratio analysis of a construction firm is used for analysis by :

    • Options
    • A. share holders
    • B. firm's management
    • C. Banks of the firm
    • D. financial analysts
    • E. All of these.
    • Discuss
    • 7. If a is the base amount expenditure, b is the increase in the operation cost each year over a period of n years, the total cost of maintenance is :

    • Options
    • A. a + (n + 1) b
    • B. a + (n - 1) b
    • C. a x (n - 1) b
    • D. a - (n - 1) b
    • Discuss
    • 8. Present worth Annuity (PWA) is generally known as

    • Options
    • A. Premium annuities
    • B. Income annuities
    • C. Future annuities
    • D. All of these
    • Discuss
    • 9. The construction estimate of a project is used by :

    • Options
    • A. the owner of the facility
    • B. the consulting architect/engineer
    • C. the contractor of the project
    • D. All of these
    • Discuss
    • 10. A construction estimate is used

    • Options
    • A. to judge tentatively or approximate value of the project
    • B. to produce a statement of the approximate cost
    • C. to decide an approximation of the value of the project and not the exact cost.
    • D. None of these