CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Engineering Economy
Comments
Question
Pick up the correct statement from the following:
Options
A. Ratio analysis is the procedure of determining and interpreting numerical relationship of various items of the financial statement.
B. All financial ratios are obtained by relating two sets of information contained in a Single financial statement.
C. The relationship between two accounting figures expressed mathematically, is known as a financial ratio.
D. All of these
Correct Answer
All of these
Engineering Economy problems
Search Results
1. The interest calculated on the basis of 365 days a year, is known as :
Options
A. interest
B. ordinary simple interest
C. exact simple interest
D. None of these
Show Answer
Scratch Pad
Discuss
Correct Answer: exact simple interest
2. The ratio of current assests to current liabilities is known as
Options
A. Liquidity ratio
B. Current ratio
C. Acid-Test (or Quick) ratio
D. Debts ratio
Show Answer
Scratch Pad
Discuss
Correct Answer: Current ratio
3. Pick up the correct statement from the following:
Options
A. A NPV profile graph shows the curvilinear relationship between the net present value of the project and discount rate employed.
B. In a NPV profile, if discount rate is zero, then net present value is simply total cash inflows less the total cash outflows of the project.
C. As the discount rate increases, the net present value profile slopes downward to the right.
D. All of these
Show Answer
Scratch Pad
Discuss
Correct Answer: All of these
4. Pick up the correct statement from the following:
Options
A. The financial ratio summarises some aspect of the firm's financial condition at the time of preparing a balance sheet.
B. Both the numerator and denominator of financial ratios come directly from the balance sheet.
C. Income statement ratios compare one 'flow' item from the income statement to another flow item from the income statement.
D. Income statement ratios compare a flow item from the income statement to another flow item form the income statement
E. All of these
Show Answer
Scratch Pad
Discuss
Correct Answer: All of these
5. If
S
is the future capital accumulated in
n
years at the rate of interest
i
per annum, then present worth is :
Options
A.
B.
S
(1 +
i
)
n
C.
S
(1 +
i
)
1/
n
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer:
6. If interest is paid more than once in a year,
i
is the rate of interest per year,
n
is the number of periods in years and
m
is a number of periods per years, compound amount factor (CAF) is :
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
7. Both architect and engineer make use of the cost estimate of the project:
Options
A. for site selection
B. for designing of the project
C. for choosing alternatives
D. All of these
Show Answer
Scratch Pad
Discuss
Correct Answer: All of these
8. Ratio analysis of a construction firm is used for analysis by :
Options
A. share holders
B. firm's management
C. Banks of the firm
D. financial analysts
E. All of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: financial analysts
9. If
a
is the base amount expenditure,
b
is the increase in the operation cost each year over a period of
n
years, the total cost of maintenance is :
Options
A.
a
+ (
n
+ 1)
b
B.
a
+ (
n
- 1)
b
C.
a
x (
n
- 1)
b
D.
a
- (
n
- 1)
b
Show Answer
Scratch Pad
Discuss
Correct Answer:
a
+ (
n
- 1)
b
10. Present worth Annuity (PWA) is generally known as
Options
A. Premium annuities
B. Income annuities
C. Future annuities
D. All of these
Show Answer
Scratch Pad
Discuss
Correct Answer: All of these
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering