  • Probabilistic estimating of a construction project includes:


  • Options
  • A. Labour
  • B. Productivity
  • C. wage scale
  • D. All of these

  • Correct Answer
  • All of these 


  • Engineering Economy problems


    Search Results


    • 1. The key to profitable operation for project cost control, is :

    • Options
    • A. To keep the project cost equal to original cost estimate.
    • B. To keep the project cost equal to subsequent construction budget.
    • C. To keep the project cost within the cost budget and knowing when and where job costs are deviating.
    • D. None of these
    • Discuss
    • 2. Pick up the correct statement from the following:

    • Options
    • A. An annuity is a series of equal payments occurring at equal period of time.
    • B. Annuity is called an equal payment or uniform payment series.
    • C. An annuity may have periods of time of any length but should always be of equal length.
    • D. All the above.
    • Discuss
    • 3. If P is principal amount, i is the rate of interest and n is the number of periods in years, then the interest factor is :

    • Options
    • A. (1 + ni)
    • B. (ni - 1)
    • C. ni
    • D. None of these
    • Discuss
    • 4. Pick up the correct statement from the following:

    • Options
    • A. The ability of a company to meet obligations which are likely to mature in short term, is called liquidity.
    • B. The liquidity ratio may be defined as a relationship of current liabilities and current assests and advances.
    • C. The liquidity ratios are used to indicate the financial position of the firm.
    • D. All of these
    • Discuss
    • 5. Refer to the cash flow diagram of uniform gradient in a cash flow (in the given figure), the gradient is :

    • Options
    • A. Rs 10000 per year
    • B. Rs 15000 per year
    • C. Rs 20000 per year
    • D. Rs 25000 per year
    • Discuss
    • 6. Pick up the correct statement from the following:

    • Options
    • A.
    • B. Over head cost per unit = Overhead ratio x direct labour cost/unit
    • C. both (a) and (b)
    • D. neither (a) nor (6)
    • Discuss
    • 7. Current ratio is :

    • Options
    • A.
    • B.
    • C.
    • D. None of these.
    • Discuss
    • 8. The estimate based on a detailed quantity survey and furnishes the most accurate and reliable estimate possible is known as

    • Options
    • A. Conceptual estimate
    • B. Definitive estimate
    • C. Probabilistic estimate
    • D. None of these
    • Discuss
    • 9. Pick up the ratio which gives us sufficient information by which to judge the financial condition and performance of the firm, from the following:

    • Options
    • A. Liquidity ratio
    • B. Financial leverage ratio
    • C. Activity ratio
    • D. Portability
    • E. None of these
    • Discuss
    • 10. The estimator for definitive estimates must be able :

    • Options
    • A. and an all-around construction expert.
    • B. to read the plans and specifications to determine accurate quantities of permanent materials and installed Equipment.
    • C. to express the job material requirements in dimensions suitable for costing and construction supplies.
    • Discuss