Home Civil Engineering Tunnelling Comments

  • Question
  • For B.G. single track railway, the height of the tunnel above top of rails should be


  • Options
  • A. 5.5 m to 5.8 m
  • B. 5.8 m to 6.2 m
  • C. 6.7 m to 7.3 m
  • D. 7.3 m to 7.5 m

  • Correct Answer
  • 6.7 m to 7.3 m 


  • Tunnelling problems


    Search Results


    • 1. An overhead track on a large truss frame is required in case of car changer by

    • Options
    • A. the grass hopper method
    • B. the passing track method
    • C. California crossing method
    • D. Dixon conveyor method.
    • Discuss
    • 2. For B.G. single track, the section of the tunnel must have a width

    • Options
    • A. 4.2 m to 4.5 m
    • B. 4.5 m to 4.8 m
    • C. 4.9 m to 5.5 m
    • D. 5.5 m to 5.8 m
    • Discuss
    • 3. Which one of the following methods is adopted for permanent drainage of tunnels :

    • Options
    • A. provision of longitudinal drains
    • B. continuous open drains
    • C. concrete lining
    • D. grouting with cement or chemicals
    • E. All the above.
    • Discuss
    • 4. Pick up the correct statement from the following:

    • Options
    • A. The topographical maps of the Survey of India are useful in the mountainous region for tunnelling.
    • B. The height point on the ridge is fixed with the help of reciprocal ranging
    • C. The accuracy of 1 in 10, 000 is required for planimetric control
    • D. 1 second theodolite is used for angular measurement to achieve an angular error of 15 N where N is number of angles
    • E. All the above.
    • Discuss
    • 5. The following operations are required for tunnelling in rocky terrain :
      1. Removing the foul gases
      2. Marking the tunnel profile
      3. Setting up and drilling
      4. Checking misfire
      5. Mucking
      The correct sequence is :

    • Options
    • A. 1 2 3 4 5
    • B. 2 3 5 4 1
    • C. 4 2 1 3 5
    • D. 2 3 1 4 5
    • Discuss
    • 6. For transferring the tunnel alignment through shafts, we adopt the following steps :
      1. Hanging two or more plumb lines in the shaft
      2. Determining the bearing of the plumb lines i.e. plumb plane
      3. Suspending a 35 kg weight by each plumb line
      4. Immersing the weights of both the plumb lines in the buckets containing water.
      The correct sequence of steps is :

    • Options
    • A. 1 2 3 4
    • B. 4 3 2 1
    • C. l 3 2 4
    • D. 2 1 4 3
    • Discuss
    • 7. For initial surveys of tunnels, the following activities are involved:
      1. Marking portal point with concrete pillars on the ground
      2. Marking tunnel obligatory points on the topographical maps
      3. Preliminary setting of the tunnel on the topographical Survey of India maps
      3. Driving lines between the fixed obligatory points.
      The correct sequence of the activities is :

    • Options
    • A. 3 2 4 1
    • B. 1 2 3 4
    • C. 4 3 1 2
    • D. 2 4 3 1
    • Discuss
    • 8. Pick up the mechanical ventilation method used for tunnels from the following:

    • Options
    • A. blowing fresh air by ducts to the face of tunnel
    • B. exhausting foul air by ducts from the face of the tunnel and permitting fresh air through the tunnel
    • C. blowing fresh air and exhausting foul air by ducts
    • D. all the above.
    • Discuss
    • 9. In the wooded bulk-head, used for mucking in steep grade tunnels,

    • Options
    • A. one opening is provided
    • B. two openings are provided
    • C. three openings are provided
    • D. no opening is provided.
    • Discuss
    • 10. Concrete lining is provided concurrently with the driving operation in case of

    • Options
    • A. rock terrain
    • B. soft rock
    • C. running soil
    • D. none of these.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment