  • The advantages of providing a pair of tunnels as compared to only one large highway tunnel is :


  • Options
  • A. economy in cost of construction
  • B. avoidance of head on collisions
  • C. provision of separate exit and entrance of two traffic streams
  • D. facility in carrying out repairs
  • E. All the above.

  • Correct Answer
  • All the above. 


  • Tunnelling problems


    Search Results


    • 1. In the given figure drill holes, heading, mucking and benching are mumbered as 1, 2, 3, 4 The correct sequence is :

    • Options
    • A. 4 1 2 3
    • B. 1 2 3 4
    • C. 4 1 3 2
    • D. 3 4 1 3
    • Discuss
    • 2. Railway tunnels, are generally

    • Options
    • A. polycentric
    • B. rectangular
    • C. parabolic
    • D. circular
    • E. none of these.
    • Discuss
    • 3. For tunnels exceeding 300 m in length, the grade should be provided below

    • Options
    • A. 50% of the ruling gradient
    • B. 60% of the ruling gradient
    • C. 75% of the ruling gradient
    • D. 80% of the ruling gradient.
    • Discuss
    • 4. Pick up the correct statement regarding drilling a tunnel from the following:

    • Options
    • A. Holes are drilled by pneumatically operated rock drills
    • B. One drill is required for each 4 to 5 m2 force area
    • C. The diameter of the bore hole at the deepest point should be 6 mm more than the diameter of the cartridge
    • D. All of the above.
    • Discuss
    • 5. The method of draining in the tunnels, is generally known as

    • Options
    • A. foredrainage
    • B. dewatering
    • C. permanent drainage
    • D. All of the above.
    • Discuss
    • 6. For full face method, the excavation to be done is generally divided into

    • Options
    • A. two sections
    • B. three sections
    • C. four sections
    • D. five sections.
    • Discuss
    • 7. The concentration of the dust particles of the size 0.5 to 5 microns adjacent to the working face should not be more than

    • Options
    • A. 200 particles/cm3
    • B. 250 particles/cm3
    • C. 300 particles/cm3
    • D. 450 particles/cm3
    • E. 400 particles/cm3
    • Discuss
    • 8. A tunnel is found more advantageous as compared to the alternate routes because it:

    • Options
    • A. remains free from snow
    • B. reduces the cost by reducing the route distance
    • C. reduces the maintenance cost
    • D. avoids interference with surface rights
    • E. All the above.
    • Discuss
    • 9. In case of railways,

    • Options
    • A. a detour round the hill is preferred
    • B. a open cut is preferred
    • C. tunnelling is preferred
    • D. All the above.
    • Discuss
    • 10. The following operations are required for tunnelling in rocky terrain :
      1. Removing the foul gases
      2. Marking the tunnel profile
      3. Setting up and drilling
      4. Checking misfire
      5. Mucking
      The correct sequence is :

    • Options
    • A. 1 2 3 4 5
    • B. 2 3 5 4 1
    • C. 4 2 1 3 5
    • D. 2 3 1 4 5