CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Water Resources Engineering
Comments
Question
For computing the run off volumes of large areas, number of infiltrations used are
Options
A. 2
B. 3
C. 4
D. 5
Correct Answer
2
Tags:
Bank Exams
,
Bank PO
Water Resources Engineering problems
Search Results
1. For calculating the evaporation rate over a reservoir surface
E
= 0.771 (1.465 - 0.00732
B
) (0.44 - 0.007375
V
) (
p
e
-
p
a
), the equation is given by
Options
A. Roohwer's, formula in M.K.S.
B. Roohwer's formula in F.P.S.
C. Dalton's formula in F.P.S.
D. Dalton's formula in M.K.S.
Show Answer
Scratch Pad
Discuss
Correct Answer: Roohwer's, formula in M.K.S.
2. Burge formula
cumecs is based upon
Options
A. rainfall and drainage area
B. run off and drainage area
C. drainage area and its shape
D. drainage area.
Show Answer
Scratch Pad
Discuss
Correct Answer: drainage area and its shape
3. According to Robert E. Horton, the equation of infiltration capacity curve, is (where letters carry their usual meanings)
Options
A.
f
=
f
c
(
f
o
-
f
c
)
e
kt
B.
f
=
f
t
- (
f
o
-
f
c
)
e
-
kt
C.
f
=
f
t
+ (
f
o
-
f
c
)
e
-
kt
D.
f
=
f
+ (
f
o
-
f
c
)
e
kt
Show Answer
Scratch Pad
Discuss
Correct Answer:
f
=
f
t
+ (
f
o
-
f
c
)
e
-
kt
4. The run off a drainage basin is
Options
A. Initial recharge + ground water accretion + precipitation
B. Precipitation + ground water accretion + initial recharge
C. Precipitation - ground water accretion + initial recharge
D. Precipitation - ground water accretion - initial recharge.
Show Answer
Scratch Pad
Discuss
Correct Answer: Precipitation - ground water accretion - initial recharge.
5. If the area of storm hydrograph is equal to 10
2
cm, the ordinates of a unit hydrograph may be obtained by dividing the ordinates of the storm hydrograph by
Options
A. 0.5
B. 1
C. 2
D. 3
E. 4
Show Answer
Scratch Pad
Discuss
Correct Answer: 4
6. The quantity of water retained by the sub-soil against gravity, is known
Options
A. yield
B. porosity
C. specific yield
D. specific retention
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: specific retention
7. If a gauge is installed perpendicular to the slope, its measurement is reduced by multiplying
Options
A. sine of the angle of inclination with vertical
B. cosine of the angle of inclination with vertical
C. tangent of the angle of inclination with vertical
D. calibration coefficient of the gauge.
Show Answer
Scratch Pad
Discuss
Correct Answer: cosine of the angle of inclination with vertical
8. Prof. Running suggested the method for extending the discharge curve. It is known as
Options
A. Logarithmic method
B.
y
method
C. General method
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: Logarithmic method
9. While calculating the average depth of annual precipitation in a catchment basin, importance to individual raingauge station is given in
Options
A. Arithmetical method
B. Thiessen's mean method
C. Isohyetal method
D. both (a) and (b)
E. both (b) and (c).
Show Answer
Scratch Pad
Discuss
Correct Answer: both (b) and (c).
10. Pick up the correct statement from the following :
Options
A. Rain which is intercepted by buildings, vegetations and other objects, is generally known as rainfall interception
B. The difference between the total rainfall and intercepted rainfall, is generally called ground rainfall
C. When rainfall exceeds the interception rainfall, water reaches the ground and infiltration starts
D. The maximum rate of absorbing water by the soil in any given condition, is known as infiltration capacity
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering