CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Advanced Surveying
Comments
Question
Triangulation surveys are carried out for locating
Options
A. control points for surveys of large areas
B. control points for photogrammetric surveys
C. engineering works, i.e. terminal points of long tunnels, bridge abutments, etc.
D. all the above.
Correct Answer
all the above.
Advanced Surveying problems
Search Results
1. The necessary geometrical condition for triangulation adjustment, is :
Options
A. The sum of the angles around a station should be 360°
B. The sum of the three angles of a plane triangle should be 180°
C. The sum of the eight angles of a braced quadrilateral should be 360°
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
2. Latitude of a place is the angular distance from
Options
A. Greenwich to the place
B. equator to the poles
C. equator to the nearer pole
D. equator to the nearer pole along the meridian of the place
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
3. If ? and ? be the latitude of an observer and declination of a heavenly body respectively, the upper culmination of the body will be south of zenith if its zenith distance, is
Options
A. ? - ?
B. ? - ?
C. ? + ?
D.
(? - ?).
Show Answer
Scratch Pad
Discuss
Correct Answer: ? - ?
4. At western elongation, the pole star moves
Options
A. eastward
B. westward
C. northward
D. southward.
Show Answer
Scratch Pad
Discuss
Correct Answer: southward.
5. In a tropical year, the number of sidereal days are
Options
A. one less than mean solar days
B. one more than mean solar days
C. equal to mean solar days
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: one more than mean solar days
6. International date line is located along
Options
A. standard meridian
B. Greenwich meridian
C. equator
D. 180° longitude
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 180° longitude
7. Accidental errors
Options
A. do not follow any definite mathematical law
B. cannot be removed by applying corrections to the observed values
C. are generally small
D. are also known as compensating errors
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. The movement of the projector in
y
-direction, introduces in the model a
y
-parallax
Options
A. maximum at position 1
B. maximum at position 2
C. maximum at position 5 and 6
D. maximum at positions 3 and 4
E. equally throughout the model.
Show Answer
Scratch Pad
Discuss
Correct Answer: equally throughout the model.
9. While making astronomical observations, the observer is mainly concerned with
Options
A. the direction of the vertical, the axis of rotation of the instrument
B. the direction of the poles of the celestial sphere
C. the direction of the star from the instrument
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
10. The angle between the axis of earth and the vertical at the station of observation is called
Options
A. astronomical latitude
B. astronomical co-latitude
C. co-declination of star
D. declination of star.
Show Answer
Scratch Pad
Discuss
Correct Answer: astronomical co-latitude
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering