  • Question
  • The increased cohesiveness of concrete, makes it


  • Options
  • A. less liable to segregation
  • B. more liable to segregation
  • C. more liable to bleeding
  • D. more liable for surface scaling in frosty weather
  • E. none of these.

  • Correct Answer
  • less liable to segregation 


  • Concrete Technology problems


    Search Results


    • 1. If 1500 g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is,

    • Options
    • A. 20%
    • B. 25%
    • C. 30%
    • D. 35%
    • E. 40%
    • Discuss
    • 2. The following proportion of the ingredients of concrete mix, is not in conformation to arbitrary method of proportioning

    • Options
    • A. 1 : 1 : 2
    • B. 1 : 2 : 4
    • C. 1 : 3 : 6
    • D. 1 : 2 : 8
    • E. 1 : 4 : 10
    • Discuss
    • 3. Curing a concrete for long period ensures better

    • Options
    • A. volume stability
    • B. strength
    • C. water resistance
    • D. water tightness and durability
    • E. all the above.
    • Discuss
    • 4. Curing

    • Options
    • A. reduces the shrinkage of concrete
    • B. preserves the properties of concrete
    • C. prevents the loss of water by evaporation
    • D. all of the above.
    • Discuss
    • 5. The process of proper and accurate measurement of concrete ingredients for uniformity of proportion, is known

    • Options
    • A. grading
    • B. curing
    • C. mixing
    • D. batching
    • E. none of these.
    • Discuss
    • 6. To obtain cement dry powder, lime stones and shales or their slurry, is burnt in a rotary kiln at a temperature between

    • Options
    • A. 1100° and 1200°C
    • B. 1200° and 1300°C
    • C. 1300° and 1400°C
    • D. 1400° and 1500°C
    • E. 1500° and 1600°C
    • Discuss
    • 7. M10 grade of concrete approximates

    • Options
    • A. 1 : 3 : 6 mix
    • B. 1 : 1 : 2 mix
    • C. 1 : 2 : 4 mix
    • D. 1 : 1.5 : 3 mix
    • E. none of these.
    • Discuss
    • 8. The rock which is not calcareous, is :

    • Options
    • A. lime stone
    • B. macl
    • C. chalk
    • D. laterite
    • E. none of these.
    • Discuss
    • 9. Under normal conditions using an ordinary cement, the period of removal of the form work, is :

    • Options
    • A. 7 days for beam soffits
    • B. 14 days for bottom slabs of spans 4.6 m and more
    • C. 21 days for bottom beams over 6 m spans
    • D. 2 days for vertical sides of columns
    • E. all the above.
    • Discuss
    • 10. The standard sand now a days used in India, is obtained from

    • Options
    • A. Jaipur (Rajasthan)
    • B. Jullundur (Punjab)
    • C. Hyderabad (Andhra Pradesh)
    • D. Ennore (Madras)
    • E. Cuttuck (Orissa).
    • Discuss