CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Building Construction
Comments
Question
For providing a raft foundation, the following activities are involved
ramming the foundation bed
excavation of the soil upto required depth
laying the reinforcement over the foundation bed
curing the cement concrete placed over reinforcement
pouring the cement concrete over the reinforcement.
The correct sequence is
Options
A. 1, 2, 3, 4, 5
B. 5, 4, 3, 2, 1
C. 2, 1, 3, 5, 4
D. 3, 2, 5, 1, 4.
Correct Answer
2, 1, 3, 5, 4
Building Construction problems
Search Results
1. The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed
Options
A. 5 m
B. 10 m
C. 15 m
D. 20 m
E. 25 m.
Show Answer
Scratch Pad
Discuss
Correct Answer: 5 m
2. If (?) is the angle of repose of soil of weight
w
kg/m
3
, the horizontal pressure
p
at a depth of
h
metres per metre length of wall, is
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
3. During percussion drilling
Options
A. ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole
B. caving or mixing of strata are caused in soft soils or cohesionless soils
C. the soil to a considerable depth below the bottom of the hole gets disturbed
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
4. Pick up the incorrect statement from the following :
Options
A. Cement is added to lime mortar to increase its hydraulic properties only
B. Lime surkhi mortar is used for pointing the walls
C. Lime should be slaked before preparing lime mortar
D. High early strength concrete is generally used in cold weather.
Show Answer
Scratch Pad
Discuss
Correct Answer: Cement is added to lime mortar to increase its hydraulic properties only
5. The form work from the underside of slabs, can be removed only after
Options
A. 1 day
B. 4 days
C. 7 days
D. 14 days.
Show Answer
Scratch Pad
Discuss
Correct Answer: 7 days
6. Hydration of cement is due to chemical action of water with
Options
A. Tricalcium silicate and dicalcium silicate
B. Dicalcium silicate and tricalcium aluminate
C. Tricalcium aluminate and tricalcium alumino ferrite
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
7.
W
p
and
W
f
are the weights of a cylinder containing partially compacted and fully compacted concrete. If the compaction factor
is 0.95, the workability of concrete is
Options
A. extremely low
B. very low
C. low
D. high
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: high
8. The commonly used material in the manufacture of cement is
Options
A. sand stone
B. slate
C. lime stone
D. graphite.
Show Answer
Scratch Pad
Discuss
Correct Answer: lime stone
9. Slump test is done for
Options
A. clay
B. sand
C. lime
D. concrete.
Show Answer
Scratch Pad
Discuss
Correct Answer: concrete.
10. Internal friction between the ingredients of concrete, is decreased by using
Options
A. less water
B. fine aggregates
C. rich mix
D. more water and coarse aggregates
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: more water and coarse aggregates
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering