  • A projecting piece usually provided to support a truss, is


  • Options
  • A. cornice
  • B. coping
  • C. frieze
  • D. lintal.

  • Correct Answer
  • frieze 


  • Building Construction problems


    Search Results


    • 1. Pick up the correct statement from the following:

    • Options
    • A. Louvered door is generally provided in bath rooms
    • B. Flush door is generally provided in dinning room
    • C. Revolving door is generally provided in cinema halls
    • D. Sliding door is generally provided in show rooms
    • E. All the above.
    • Discuss
    • 2. Which one of the following factors is considered for the orientation of buildings :

    • Options
    • A. the direction of the prevailing winds in the area
    • B. the exposure of the walls and roof of the buildings to the rays of sun
    • C. the extent up to which the sunrays penetrate with the verandah.
    • D. all the above.
    • Discuss
    • 3. The pile which is provided with a bulb filled with concrete at its lower end, is known as

    • Options
    • A. Simplex pile
    • B. Mac-Arthur pile
    • C. Raymond pile
    • D. Franki pile
    • E. none of these.
    • Discuss
    • 4. Queen closer may be placed

    • Options
    • A. in header course
    • B. in stretcher course
    • C. in header course next to first brick
    • D. in stretcher course next to first brick
    • E. in any position.
    • Discuss
    • 5. According to Rankine's formula, minimum depth of foundations, is

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 6. To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act

    • Options
    • A. at the centre of the base
    • B. within the middle third of the base
    • C. within the middle fifth of the base
    • D. neither (a), (b) nor (c).
    • Discuss
    • 7. The raft slab is projected beyond the outer walls of the structure by

    • Options
    • A. 5 to 10 cm
    • B. 15 to 20 cm
    • C. 25 to 30 cm
    • D. 30 to 45 cm
    • E. 60 cm.
    • Discuss
    • 8. The form work from the underside of slabs, can be removed only after

    • Options
    • A. 1 day
    • B. 4 days
    • C. 7 days
    • D. 14 days.
    • Discuss
    • 9. Pick up the incorrect statement from the following :

    • Options
    • A. Cement is added to lime mortar to increase its hydraulic properties only
    • B. Lime surkhi mortar is used for pointing the walls
    • C. Lime should be slaked before preparing lime mortar
    • D. High early strength concrete is generally used in cold weather.
    • Discuss
    • 10. During percussion drilling

    • Options
    • A. ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole
    • B. caving or mixing of strata are caused in soft soils or cohesionless soils
    • C. the soil to a considerable depth below the bottom of the hole gets disturbed
    • D. all the above.
    • Discuss