In a PERT network, the activity durations are given as to (optimistic), tp (pessimistic) and tm (most likely time). What is the variance of is activity?
Options
A.
B.
C.
D. None of the above
Correct Answer
More questions
1. The rise and fall method of reduction of levels, provides a check on
3. Effective length of a column effectively held in position and restrained in direction at one end but neither held in position nor restrained in direction at the other end, is
10. If x% is the gradient of an alignment and y% is the gradient after proper superelevation along a curved portion of a highway, the differential grade along the curve, is