CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Docks and Harbours
Comments
Question
Which one of the following statements is not relevant to hydrographic survey :
Options
A. establishment of a chain of bench marks near the shore line
B. establishment of horizontal control points on the shore
C. determination of the sea bed profile
D. depicting the irregularities in the shore line, islands and projecting rocks
E. none of these.
Correct Answer
none of these.
Docks and Harbours problems
Search Results
1. Pick up the correct statement from the following:
Options
A. the Mediterranean sea is considered to be a huge harbour
B. the Caspean sea is considered to be a big harbour
C. the Red sea is considered to be harbour
D. none of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: the Mediterranean sea is considered to be a huge harbour
2. Buoys which support the cables to which vessels are attached are of
Options
A. cylindrical shape
B. drum
C. pear shaped
D. spherical shape
E. all of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these.
3. Pick up the incorrect statement from the following: In a dry dock block made of hard wood,
Options
A. spacing of the blocks is 1.35 m
B. the lowest block is 1.8 m long 40 cm x 40 cm in cross-section
C. the middle block is 1.6 m long 40 cm x 40 cm in crosss-section
D. the top block is 1.2 m long 40 cm x 40 cm in cross-section
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
4. In a wet dock system,
Options
A. minimum required depth of water for the vessels is maintained
B. entrance locks are provided with massive gates
C. the locks of dock gate are operated by means of heavy bascule bridges and connected machinery
D. the cost of construction is quite heavy
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
5. Pick up the correct statement from the following:
Options
A. The tides at any place occur a little less than 1 hour later, each succeeding day
B. The difference in time in solar hours and minutes from any lunar transit to the succeeding transit, is called high water level
C. The influence of the earth's gravity alone produces level-tidal less sea
D. The spinning force is maximum at the equator and zero at the poles
E. All of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All of the above.
6. Which one of the following lines is used for tying a ship with a dock
Options
A. bow line
B. stern line
C. spring line
D. break line
E. all of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these.
7. Which one of the following land marks on the coast line must be depicted on hydrographic maps?
Options
A. shore line
B. light houses
C. church spires
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. If
h
and
h
1
are the heights of a light house and the observer in a ship in metres above M S L then the horizontal distance from the ship to the light house in kilometres is
Options
A. 3.86 (
h
+
h
1
)
B. 3.86 (
h
-
h
1
)
C. 3.86 (
h
x
h
1
)
D. 3.86 ? (
h
+
h
1
)
Show Answer
Scratch Pad
Discuss
Correct Answer: 3.86 (
h
+
h
1
)
9. For location of soundings a range and one angle from the shore involves the following operations. Which one is correct?
Options
A. A range line is established
B. The first and the last soundings and every tenth soundings are fixed by angular observations
C. The intermediate soundings are fixed by the time intervals
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
10. According to the recommendations of International Navigational Congress in 1912, the ratio of length to width at the entrance for cargo vessels is
Options
A. 5.5 and 6.0 to 1
B. 6.2 and 6.8 to 1
C. 7.4 and 7.8 to 1
D. 8.2 and 8.5 to 1
Show Answer
Scratch Pad
Discuss
Correct Answer: 7.4 and 7.8 to 1
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering