logo

CuriousTab

CuriousTab

Discussion


Home Civil Engineering Estimating and Costing Comments

  • Question
  • The concrete work for the following part of the building of specified thickness is measured in square metres


  • Options
  • A. Root slabs
  • B. Floors
  • C. D.P.C.
  • D. Wall panels
  • E. All the above.

  • Correct Answer
  • All the above. 


  • Estimating and Costing problems


    Search Results


    • 1. In case of laying gullies, siphons, intercepting traps, the cost includes

    • Options
    • A. Setting and laying
    • B. Bed concreting
    • C. Connection to drains
    • D. All of these.
    • Discuss
    • 2. The height of the sink of wash basin above floor level is kept

    • Options
    • A. 60 cm
    • B. 70 cm
    • C. 75 cm to 80 cm
    • D. 80 cm
    • Discuss
    • 3. The plinth area of a building not includes

    • Options
    • A. area of the walls at the floor level
    • B. area of stair cover
    • C. internal shaft for sanitary installations up to 2 sq m. in area
    • D. lift and wall including landing
    • E. area of cantilevered porch.
    • Discuss
    • 4. The cross-sections for a highway is taken at

    • Options
    • A. right angle to the centre line
    • B. 30 metres apart
    • C. intermediate points having abrupt change in gradient
    • D. the starting end points of the curves
    • E. All the above.
    • Discuss
    • 5. Brick walls are measured in sq. m if the thickness of the wall is

    • Options
    • A. 10 cm
    • B. 15 cm
    • C. 20 cm
    • D. None of these.
    • Discuss
    • 6. Cost of fittings and their fixing is specified for the following sanitary fittings

    • Options
    • A. Water closets
    • B. Flushing pipes
    • C. Lavatary basins
    • D. Sinks
    • E. All the above.
    • Discuss
    • 7. The area is measured correct to the nearest

    • Options
    • A. 0.01 sqm
    • B. 0.02 sqm
    • C. 0.03 sqm
    • D. 0.04 sqm
    • E. 0.05 sqm
    • Discuss
    • 8. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

    • Options
    • A. 1.5 m3
    • B. 2.5 m3
    • C. 3.5 m3
    • D. 5.0 m3
    • Discuss
    • 9. Pick up the item whose weight is added to the weight of respective item, is

    • Options
    • A. Cleats
    • B. Brackets
    • C. Bolts
    • D. Distance separators
    • E. All the above.
    • Discuss
    • 10. On a hydrographic map, the following feature is shown :

    • Options
    • A. datum
    • B. high and low water lines
    • C. depth contours
    • D. land and water areas
    • E. all the above.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment